My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 07/16/2024
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2024
>
Agenda - Public Works Committee - 07/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:47:31 AM
Creation date
7/15/2024 1:32:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
07/16/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Operations and Maintenance <br /> Continued <br /> J. Unit Costs for Trail Overlay <br /> The following section includes costs associated with materials and labor for an overlay project on a <br /> segment of trail in Ramsey <br /> 1. MATERIAL COSTS <br /> • ASPHALT =25.85/TON <br /> • TACK OIL -15.00/5 GALLON PAIL <br /> • TRUCKING/LABOR =50.00/HR <br /> • LABOR = 2.75 X WAGE <br /> 14.60 X 2.75 = 40.15 <br /> 19.20 X 2.75 = 52.80 <br /> 2. CENTRAL TRAIL <br /> MATERIAL <br /> • ASPHALT = 25.85/TON X 12 TON = $ 310.20 <br /> • TACK = 15.00/PAIL X 5 PAILS = 75.00 <br /> • TRUCKING = 50.00 X 2 TRUCKS X 4 HOURS = 400.00 <br /> • LABOR = 14.60 X 2.75 = 40.15 X 4 = 160.60 <br /> = 19.20 X 2.75 = 52.80 X 4 = 211.20 <br /> $1157.00 <br /> Trail Length = 175'X 8.5 GUIDE <br /> Overlay thickness = 1.5" <br /> Unit Price = $6.61/linear foot <br /> Unit Price = $7.00/square yard <br /> ISSUED FORREVIEWMAIr Master Trail Plan <br /> 12004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.