My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 07/16/2024
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2024
>
Agenda - Public Works Committee - 07/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:47:31 AM
Creation date
7/15/2024 1:32:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
07/16/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DESCRIPTION OF WORK <br /> SUMMARY <br /> This project consists of trail pavement rehabilitation intended to improve the serviceability <br /> and ride quality of the shared multi-use paved trail within the southwest quadrant of the City <br /> of Monticello. (see enclosed map of the project area). The trail segments identified for work <br /> have experienced surface deficiencies primarily in the form of surface cracking minor to major <br /> raveling. The trail pavement will require crack filing, asphalt removal and patching or infrared <br /> patching, tree root cutting/barrier and micro surfacing treatment installation. Bidders are <br /> encouraged to visit the site along with City staff to fully understand all of the project <br /> components. A lump sum breakdown including the unit prices for crack filling, asphalt patch, <br /> micro surfacing, fog sealing, tree root cutting, root barrier and pavement reconstruct work <br /> shall be provided along with the bid. <br /> The trail segment is a component of the City of Monticello paved trail system, a heavily-used <br /> route for trail users of all recreation types: walking/hiking/running, dog-walking, biking, <br /> rollerblading, commuting, and roller skiing. For these reasons, the Contractor must pay <br /> careful attention to the requirements for safety, maintenance of traffic, and approved work <br /> times, as referenced throughout the Contract Documents. <br /> To maintain heavy trail traffic during the summer months, the Contractor will be required to <br /> place micro surfacing in specific trail Segments, allowing trail to fully dry prior to moving <br /> onto next Segment. The contractor shall only close the trail segment that is actively being <br /> worked on. <br /> No contractor or subcontractor shall commence work under this contract until he has obtained <br /> at his own cost and expense all insurance required by this article, such insurance to be ap- <br /> proved by the owner and maintained by the contractor until final completion of the work. <br /> Completed operations insurance shall also be maintained by the contractor for a period of one <br /> (1) year after final completion date. <br /> The contractor shall take out and maintain for the duration of this contract statu- <br /> tory workmen's compensation insurance and employer's liability insurance as shall <br /> be required under the laws of the state of Minnesota. <br /> A. Workmen's Compensation Insurance <br /> The contractor shall take out and maintain during the life of this contract such- <br /> public liability and property damage insurance as shall protect him from <br /> all claims for bodily injury, including accidental death, as well as from all <br /> claims for property damage arising from operations under this contract. <br /> The minimum limits which are required are: Public Liability, $1,000,000 <br /> per each occurrence, General Aggregate, $1,000,000, and Worker's <br /> Compensation, $100,000 (employer's liability limit). <br /> Such policy shall include coverage for: <br /> CAUSERSTEBRA MUSGROVE\DOWNLOADS\PATHWAY MIRCO-SURFACING-2020 MPL.DOCX Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.