Laserfiche WebLink
1. A certificate will not be modified except upon ten days' prior writ- <br /> ten notice to <br /> the owner; <br /> 2. Coverage is included for blasting, collapse, and underground haz- <br /> ards; and <br /> 3. The contractual liability hazard has been insured. <br /> The contractor shall submit to the City a schedule of the intended closure dates of the trail <br /> segments one week prior to commencing work to allow the City to properly notify the <br /> public. <br /> The contractor shall not change the dates of closure once submitted (excluding delays due <br /> to weather related events). The contractor shall install temporary construction signage as <br /> necessary and as determined by the City. No substitutions will be allowed. <br /> PRESERVATION OF EXISTING FEATURES <br /> The Contractor shall minimize disruption and damages to existing Project Site features, <br /> including but not limited to lawns, trees, existing topography, pavements, and curbing. All <br /> construction access and traffic shall be confined to the routes indicated on the Drawings or <br /> by the project Engineer. Any damages to Project Site features outside the specified routes <br /> shall be repaired and restored by the Contractor to the satisfaction of the City of Monticello <br /> at no cost to the City of Monticello. <br /> The Contractor and City of Monticello shall create a photo inventory of pre-construction <br /> conditions of the Project Site for later use in determination of changed conditions. <br /> END OF SECTION <br /> CAUSERSTEBRA MUSGROVE\DOWNLOADS\PATHWAY MIRCO-SURFACING-2020 MPL.DOCX Page 3 <br />