Laserfiche WebLink
6. 10. <br /> CC Regular Session New <br /> Meeting Date: 07/23/2024 <br /> Primary Strategic Plan Initiative: Address infrastructure needs. <br /> Title: <br /> Adopt Resolution#24-195 Accepting Proposals and Awarding Contract for Fire Station No.1 Sewer and Water <br /> Connections <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolution#24-195 accepting proposals and awarding a contract for Fire <br /> Station No.1 sewer and water connections. <br /> Background: <br /> In 2021, concurrent with overlaying the Fire Station No.1 parking lot, a 6-inch ductile iron water extension was <br /> constructed. This extended a water service from the west side of the parking lot into the fire station's utility closet. <br /> The 2-inch copper line from the on-site well remains in service, supplying water to the fire station. An existing <br /> 4-inch sanitary line runs parallel to the recently installed water service, and carries sewer to an existing tank <br /> located just west of the parking lot. This overflows into the septic field located west of the parking lot in the green <br /> space. <br /> As part of the Lynwood Townhomes project, sanitary sewer and water stubs were extended to the west side of the <br /> Fire Station property. The extensions were built with the 2 nd phase of Lynwood's construction, and complete in <br /> 2023. <br /> This project proposes to complete the water and sewer extension to connect the water and sewer between the fire <br /> station and the stubs placed as part of the Lynwood Townhomes project. This requires extending approximately <br /> 80 feet of sanitary sewer, and removing the existing septic tank and impacted drain field. It also requires <br /> extending approximately 95 feet of 6"ductile iron water service and relocating a fire hydrant and 6"gate valves. <br /> A sketch of the proposed improvements is included in the attached Request for Proposal (RFP). <br /> The water service is being constructed as 6-inches to accommodate the future fire station sprinkler system, <br /> currently proposed as a 2024 improvement in the 2024—2033 Capital Improvement Program. <br /> Per the RFP,the work is proposed to occur between August 14 and September 20, 2024. This is to accommodate <br /> the 2024 election,which includes using Fire Station No.1 as a polling location. <br /> Notification: <br /> Notifications are not required with this case. <br /> Time Frame/Observations/Alternatives: <br /> Alternatives: <br /> Alternative#1 Motion to adopt Resolution#24-195 accepting proposals and awarding a contract for Fire Station <br /> No.1 sewer and water connections. <br /> Funding Source: <br />