Laserfiche WebLink
Dickenson's Mississippi Estates— IP 25-04 <br /> July 15, 2024 <br /> Page 2of3 <br /> The City would like to bid the project in February/ March of 2025. We will include bidding the project, <br /> as well as answering contractor questions, as part of our services. <br /> The City typically holds an open house meeting in the fall for property owners impacted by projects. We <br /> will prepare a preliminary site layout exhibit that the City can use at the meeting. <br /> We have assumed the City will prepare any required feasibility report and/or council reports required <br /> SCOPE OF WORK <br /> Bolton & Menk will assist the City with survey, design, and bidding related services for the project. Our <br /> work will include the following tasks: <br /> • Survey—The survey will include right-of-way research along with a topographic survey and <br /> drone image of the site. We have also included time associated with easement preparation. <br /> • Design—Design services will generally include the following tasks: <br /> o Attendance at design meetings. <br /> o Site visits to review the existing roadways and adjacent properties. <br /> o Construction Documents for the use of permitting, bidding and construction. <br /> • Public Streets and Utilities- Design services to include: <br /> o We have assumed that Tungsten Street will be designed to a 10-ton section, and <br /> Rivlyn Avenue will be designed with a typical City street section. <br /> o Review of sanitary sewer televising report and incorporation of findings into the <br /> plans. <br /> o Replacement of watermain gate valves and/or full watermain replacement. <br /> o Stormwater calculations for the roadway improvements. Implement storm sewer <br /> infrastructure improvements as needed. <br /> o Perform a review and analysis of stormwater runoff from 6140 Hwy 10 (Lano). Bring <br /> forward solutions for the City. We have not included significant improvements in <br /> our proposal, but will complete plans for needed improvements as an additional <br /> service. <br /> o We will review the need for bicycle facilities associated with the Mississippi River <br /> Trail through this area. <br /> • Reviews—We will review the final documents with the City and make revisions as needed. <br /> • Permits and Utilities—We have assumed permits will be required as follows: <br /> o Lower Rum River Watershed Management Permit (New Impervious less than 1 Acre) <br /> o Department of Health (Watermain) <br /> o NPDES (Contractor Obtained) <br /> • Bidding—We will work with the City to solicit bids for the work. <br /> • Construction—Our proposal does not include time after bid opening. A separate proposal <br /> can be provided at a later date for construction related services. <br /> PROPOSED FEES <br /> The fees listed in the attached spreadsheet are estimates based on each task. While the actual fees <br /> required for each task may vary,the total amount of$68,537.00 is considered a Not-to-Exceed amount. <br /> Bolton&Menk is an equal opportunity employer. <br />