My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/23/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 07/23/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:24:27 AM
Creation date
7/18/2024 3:51:28 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/23/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. 12. <br /> CC Regular Session New <br /> Meeting Date: 07/23/2024 <br /> Primary Strategic Plan Initiative: Address infrastructure needs. <br /> Title: <br /> Adopt Resolution#24-197 Approving Change Order#1 for Barthel's Rum River Acres and White Pines Estates <br /> Street Reconstructions, Improvement Project#24-01 <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolution#24-197 approving Change Order#1 for Barthel's Rum River <br /> Acres and White Pines Estates Street Reconstructions, Improvement Project#24-01. <br /> Background: <br /> During project construction City Staff was made aware of a drainage issue at 5500 165th Lane. This issue <br /> occurred at the transition point from concrete curb and gutter to drainage swales. The storm water runoff from the <br /> street causes the in slope of the swale to washout. To resolve this, an additional catch basin has been placed at the <br /> end of the concrete curb and gutter,which will collect the storm water runoff from the street. The catch basin <br /> connects to the main storm sewer line under 165 th Lane, and only required 14 linear feet of 12" storm sewer pipe <br /> for the connection. <br /> Additionally, during project construction City Staff was made aware of a drainage issue in the yard of 5 821 164th <br /> Lane. A drainage and utility easement exist between 5 821 and 5751 164th Lane,with the intent to handle storm <br /> water runoff from 164th Lane to existing ponds north of the properties. The existing drainage swale deviates from <br /> the drainage and utility easement, carrying water across 5821 164th Lane outside of the easement. This results in <br /> standing water after typical rain events. With this change order the drainage swale will be re-graded to stay within <br /> the existing drainage &utility easement, allowing storm water runoff from 164th Lane to carry to the pond, and <br /> avoid standing water outside of the easement. <br /> Revised plan sheets and the change order are attached to this case. <br /> Notification: <br /> If Council approves Change Order#1, Staff will notify the residents impacted by Change Order#1 with updates <br /> on the project status. <br /> Time Frame/Observations/Alternatives: <br /> Observations: <br /> This work has already been completed. Though Staff strives to request City Council approval of change orders <br /> before work occurs,this was not feasible during construction given the large expense that would occur if the <br /> Contractor's crews were forced to stop work while waiting for City Council approval to occur. <br /> Alternatives: <br /> Alternative#1 —Adopt Resolution#24-197 Approving Change Order#1 for Barthel's Rum River Acres and <br /> White Pines Estates Street Reconstructions, Improvement Project#24-01. <br /> Funding Source: <br /> Stormwater Funds will fund all costs associated with this change order. <br />
The URL can be used to link to this page
Your browser does not support the video tag.