My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/23/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 07/23/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:24:27 AM
Creation date
7/18/2024 3:51:28 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/23/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. 13. <br /> CC Regular Session New <br /> Meeting Date: 07/23/2024 <br /> Primary Strategic Plan Initiative: Address infrastructure needs. <br /> Title: <br /> Adopt Resolution#24-198 Accepting Proposals for Topographic Surveys for 2025 Pavement Management <br /> Program Projects <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolution#24-198 accepting proposals for topographic surveys for 2025 <br /> Pavement Management Program projects. <br /> Background: <br /> The current 2024 thru 2033 10-Year Capital Improvement Program(CIP)proposes street reconstructions of the <br /> following streets in 2025: <br /> •Fox Ridge Estates 1st&2nd subdivision <br /> o Design information for this subdivision was gathered in 2023, Project design is currently underway. <br /> •MSA Sunwood Drive between Nowthen Boulevard(CSAH 5) and Erkium Street <br /> •MSA Alpine Drive between Sunfish Lake Boulevard(CR 57) and Saint Francis Boulevard(TH 47) <br /> o The CIP identifies two segments of Alpine Drive which are proposed to be combined into one project. <br /> •Dickenson Mississippi Estate subdivision <br /> o Staff is submitting a design services proposal for this project as part of a separate case. <br /> •High Point subdivision <br /> o The CIP identified Section 22 Unplatted, which is proposed to be combined with the High Point <br /> subdivision project. <br /> • Sorteberg's subdivision <br /> •Beaudry's 2nd subdivision <br /> • Staff will present a separate case at a later date seeking Council approval for topographic survey for <br /> this project. <br /> In total, the 2024—2033 CIP proposes to reconstruct approximately 5.85 miles of public roads in 2025. <br /> Staff will use the topographic surveys as design aids for the improvement projects. Topographic surveys are <br /> essential to locate all existing site features and to create an existing ground surface,used as the base for designing <br /> the project. <br /> Street segment summaries and the request for proposals are attached to this case. <br /> Notification: <br /> If City Council accepts proposals, Staff will mail letters to property owners within the project areas proposed to <br /> be included within the topographic survey area(s). <br /> Time Frame/Observations/Alternatives: <br /> Alternatives: <br /> Motion to adopt Resolution#24-198 accepting proposals for topographic surveys for 2025 Pavement Management <br /> Program projects. <br />
The URL can be used to link to this page
Your browser does not support the video tag.