Laserfiche WebLink
4. IP 25-06 Sorteberg's Street Reconstructions <br /> a. Right of Way is generally 66-feet wide <br /> i. Right of Way topo area is 4.72 acres <br /> ii. D&U Easement topo area is 0.67 acres <br /> b. Streets are approximately 0.54 miles in total length <br /> i. Urban (bit. Curb) residential subdivision <br /> ii. 30-foot-wide urban (bit. Curb)with curb cuts to swales and adjacent low areas <br /> 1. Topo of drainage areas in addition to right of way required <br /> iii. No municipal utilities <br /> 5. IP 25-07 Beaudry's 2nd Street Reconstructions <br /> a. Right of is generally 66-feet wide <br /> i. Right of Way topo area is 8.35 acres <br /> b. Streets are approximately 0.88 miles in total length <br /> c. Mix of 24-foot rural and 3 0-foot urban (mix bit. & conc. Curb) <br /> i. Combination of curb cuts, swales, catch basins and culverts <br /> ii. Topo needed of culvert ends in wetland area off of 152nd Avenue <br /> d. No municipal utilities <br /> The scope of these surveys each include: <br /> a. Topographic Survey <br /> b. Contacting Gopher State One Call to locate utility markings <br /> c. Delivery of survey points in an Excel/CSV format <br /> d. Point Code listing <br /> FIELD SURVEY REQUIREMENTS: The field survey is not limited to, but is expected to include the <br /> following: <br /> • Elevations along the centerline, edge of bituminous pavement, top and bottom of swale, and boulevard up <br /> to the right-of-way at 50-foot stations and grade changes <br /> o Urban section areas shall include flowline and top back of curb shots <br /> • Location and elevations on driveway edges and corners to the right-of-way <br /> • Location and elevations of any storm sewer, sanitary sewer,watermain,utilities, structures, etc. within the <br /> survey area <br /> o Gopher One State locate calls shall be made prior to surveying <br /> • Locations and elevations of trees/tree lines, landscaping, mailboxes, signage, fence lines, etc. within the <br /> survey area <br /> • General top and bottom of slopes, and intermediate spot elevations in swales <br /> SCHEDULE: A written schedule of the work shall be submitted identifying all work components and showing <br /> work start and completion dates required to comply with the schedule. Once work has commenced,the Contractor <br /> shall continuously pursue completion in accordance with the approved schedule. The final Topographic Survey <br /> must be delivered to the City by the date listed in the attached proposal sheet. <br /> PROPOSAL SUBMITTAL: A lump sum quote for each project shall be submitted for the proposed work using <br /> the form at the end of this Request for Proposal (RFP). <br /> 3 <br />