My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/23/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 07/23/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:24:27 AM
Creation date
7/18/2024 3:51:28 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/23/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
During the bidding process, Staff was made aware of long build time for concrete structures,resulting in the <br /> substantial completion date being moved back to October 11, 2024. The current timeline to receive structures is 6 <br /> -8 weeks. <br /> Notification: <br /> Upon Council approval,notifications will be mailed to residents impacted by these improvements. <br /> Time Frame/Observations/Alternatives: <br /> Observations: <br /> A MnDOT utility permit is required before construction can begin. Staff has applied for this permit in May 2024 <br /> and anticipates receiving it soon. A Lower Rum River WMO permit is not required, and neither is a permit from <br /> the City of Nowthen since the work will occur in MnDOT right-of-way. <br /> Alternatives: <br /> Alternative#1 -Motion to adopt Resolution#24-205 accepting bids and awarding contract for Ford Brook <br /> Estates Drainage Improvements, Improvement Project#24-04. <br /> Alternative#2-Motion of other. <br /> Funding Source: <br /> Funding for this improvement is proposed to come from storm water utility funds. <br /> Bids were advertised in the Anoka Union Herald on June 14 and June 21, 2024. A total of nine(9)bids were <br /> received, opened, and tabulated, and the following bids were found to comply with the advertisement for bids. <br /> Contractor Total Bid <br /> Twin Cities Utilities, LLC $2071509.84 <br /> New Look Contracting, Inc. $2241230.50 <br /> RL Larson Excavating, Inc. $2251969.46 <br /> Dave Perkins Contracting, Inc. $2301235.35 <br /> Kuechle Underground, Inc. $2631316.70 <br /> rKurilla Contracting $2831690.00 <br /> Douglas-Kerr Underground, LLC $290,316.40 <br /> Bituminous Roadways, Inc. $298,131.20 <br /> Meyer Contracting, Inc. $317,8 8 3.2 8 <br /> Engineer's Estimate 'r$_2 3-0,303.00 <br /> The bid of Twin Cities Utilities, LLC of North Branch, Minnesota, in the amount of$207,509.84 for the total bid <br /> of said improvements in accordance with the approved plans and specifications and advertisement for bids, is the <br /> lowest responsible bidder. <br /> Adding indirect costs in the amount of 23-percent brings the total project costs to $255,237.10. <br /> The low bid is 10-percent less than the engineer's estimate, four of the nine bids were below engineer's estimate. <br /> Bolton&Menk submitted a proposal for construction staking and as-built survey of the proposed improvements <br /> for the total not-to-exceed amount of$4,162.00. The construction staking and as-built survey are included in the <br /> indirect project costs. <br /> City Staff proposes to administer and inspect construction. Plans and specifications were prepared in-house as <br /> part of Staff s normal duties. <br />
The URL can be used to link to this page
Your browser does not support the video tag.