My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/23/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 07/23/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:24:27 AM
Creation date
7/18/2024 3:51:28 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/23/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOLTON 7533 Sunwood Drive N <br /> Suite 206 <br /> ,k MENK Ramsey, M N 55303-5119 <br /> Real People. Real Solutions. Ph: (763) 433-2851 <br /> Fax: (763) 427-0833 <br /> Bolton-Menk.com <br /> July 8, 2024 <br /> Joe Feriancek, P.E. <br /> Assistant City Engineer <br /> 7550 Sunwood Drive NW <br /> Ramsey, MN 55303 <br /> RE: Proposal for Construction Staking Services, City of Ramsey— Ford Brook Drainage Improvements <br /> (City Project No. 24-04) <br /> Dear Mr. Feriancek: <br /> We appreciate the opportunity to assist the City of Ramsey with construction staking for the above <br /> referenced project. <br /> SCOPE OF WORK <br /> Bolton & Menk will complete the construction survey for the project. Staking generally includes: <br /> • 1,095 linear feet of storm sewer along both 180th Lane and TH 47, <br /> • 5 pipe aprons, <br /> • 8 storm manholes, <br /> • 10 bio roll ditch checks, and <br /> • 110 linear feet of silt fence. <br /> We will also complete the As-built Survey for Record Drawing creation. <br /> ASSUMPTIONS <br /> We have made the following assumptions in preparing this proposal: <br /> • No allowance is included for staking of removals, clearing, or right-of-way. <br /> • Replacing damaged or removed stakes is not included in our base fee. <br /> • No additional fees for stakes, mileage, equipment, etc. will be invoiced to the City, but are <br /> included in our hourly rates. <br /> • Additional services, if required, will be performed at the rates presented in the Proposed Fees <br /> section of this proposal. <br /> PROPOSED FEES <br /> Bolton & Menk proposes to perform the staking based on a not-to-exceed amount, based on the rates <br /> presented in the following table: <br /> Bolton&Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.