Laserfiche WebLink
<br />Councilmember Riley introduced the following resolution and moved for its adoption: <br /> <br />RESOLUTION #24-205 <br /> <br />RESOLUTION ACCEPTING BIDS AND AWARDING CONTRACT FOR FORD BROOK <br />ESTATES DRAINAGE IMPROVEMENTS; IMPROVEMENT PROJECT #24-04 <br /> <br />WHEREAS, the City of Ramsey proposes to construct drainage improvements within <br />Ford Brook Estates to prevent stormwater runoff generated from the City-owned right-of-way for <br />Ford Brook Estates from continuing to enter private property; and <br /> <br />WHEREAS, the City of Ramsey charges residents and businesses a monthly stormwater <br />utility fee to provide a dedicated source of revenue for stormwater drainage projects to correct <br />drainage issues and for stormwater maintenance operations; and <br /> <br />WHEREAS, pursuant to Ramsey City Council Resolution #23-280, adopted November <br />14, 2023, the City Engineer was ordered to prepare plans and specifications for Improvement <br />Project #24-04 and Bolton & Menk, Inc. was authorized to collect topographic survey in the <br />amount of $3,460.00 to assist with preparation of plans and specifications; and <br /> <br />WHEREAS, pursuant to Ramsey City Council Resolution #24-123, adopted May 28, <br />2024, the City Council approved final plans and specifications as prepared by the City Engineer <br />and authorized advertisement for bids for the same improvements; and <br /> <br />WHEREAS, proposals were received for Construction Staking and As-built Survey of <br />$4,162.00 from Bolton & Menk, Inc. for said improvements; and <br /> <br />WHEREAS, bids were advertised in the Anoka Union Herald on June 14 and June 21, <br />2024; and <br /> <br />WHEREAS, nine (9) bids were received, opened and tabulated on July 15, 2024, and the <br />following bids were found to comply with the approved plans and specifications and advertisement <br />for bids; and <br /> <br />Contractor Total Bid <br />Twin Cities Utilities LLC $207,509.84 <br />New Look Contracting, Inc. $224,230.50 <br />RL Larson Excavating, Inc. $225,969.46 <br />Dave Perkins Contracting, Inc. $230,235.35 <br />Kuechle Underground, Inc. $263,316.70 <br />Kurilla Contracting $283,690.00 <br />Douglas-Kerr Underground, LLC $290,316.40 <br />Bituminous Roadways, Inc $298,131.20 <br />Meyer Contracting, Inc. $317,883.28 <br /> <br /> <br /> <br />