My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Economic Development Authority - 08/08/2024
Ramsey
>
Public
>
Agendas
>
Economic Development Authority
>
2024
>
Agenda - Economic Development Authority - 08/08/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 12:00:23 PM
Creation date
8/1/2024 1:07:30 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Economic Development Authority
Document Date
08/08/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DESCRIPTION AMOUNT <br />Ductwork insulation is excluded <br />Labor and material to install tile on floor and 4' high on walls. 5,100.00 <br />Hang drywall where needed. Finish tape space 4,000.00 <br />Prep and prime ceiling and walls with oil primer. 12,875.00 <br />Paint ceilings with two coats for Sherwin Williams premium ceiling paint. <br />Paint walls with two coats of Sherwin Williams ProMar 200 Paint. Color and sheen to be <br />determined. Windows to also be painted. <br />Prep, stain and poly doors, frames, base and wainscoting. Color to be determined. <br />Prep and paint exterior soffits and fascia along with exterior windows with two coats of Sherwin <br />Williams Latitude paint. Color and sheen to be determined. <br />Misc. material primed poplar for wainscot (budget) 9,500.00 <br />Misc. Labor to install existing doors, wainscot 8,500.00 <br />Dumpster / Disposal 700.00 <br />Building Permit Allowance 1,200.00 <br />Sup -time / Coordination 1,800.00 <br />OH&P 11,086.00 <br />If it is not listed, it is not included. 0.00 <br />No SAC or WAC permitting figured. <br />All material pricing is subject to change on quotes as materials pricing and lead times are volatile. <br />If the ramp goes to the north - Deduct $2,000 (tree removal not included) <br />Notice of Mechanic's Lien: Minnesota Statues Section 514.001: TOTAL $122 007.00 <br />(a) Any person or company supplying labor or materials for this improvement <br />to your property may file a lien against your property if that person or company <br />is not paid for the contributions. <br />(b) Under Minnesota law, you have the right to pay persons who supplied labor <br />or materials for this improvement directly and deduct this amount from our <br />contract price, or withhold the amounts due them from us until 120 days after <br />completion of the improvement unless we give you a lien waiver signed by <br />persons who supplied any labor or material for the improvement and who gave <br />you timely notice. <br />Acceptance of Proposal: <br />The above prices, specifications, and conditions are satisfactory and are <br />hereby accepted. <br />By signing the acceptance below, you are authorizing DKN to do the work as <br />specified. <br />Accepted By Accepted Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.