My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/12/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 08/12/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:27:26 AM
Creation date
8/9/2024 8:32:52 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/12/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Change Order No. 1 <br />Client: City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />AMERICAN <br />ENGINEERING TESTING <br />Project: Ramsey Water Treatment Plant <br />14199 Jaspar Street NW <br />Ramsey, MN 55303 <br />Attn: Bruce Westby Client Project No. <br />Date: July 22, 2024 AET Project No. P-0021454 <br />American Engineering Testing, Inc. (AET), is submitting this Change Order for the following additions and changes to our work scope outlined In our proposal <br />to the City of Ramsey, dated April 10, 2023. AET is requesting additional budget for technician hours and concrete cylinders. AET's original cost estimate <br />was based off of concrete testing at a frequency of one test for every 100 cubic yards, when it should have been calculated at a frequency to perform <br />concrete testing every 50 cubic yards per the engineer (AE2S). <br />CHANGE ORDER DETAIL <br />1. Reinforcing Steel and Concrete Testing - Technician II for <br />observations of reinforcing steel and testing of concrete (90 hrs. at <br />$99/hour) <br />2. ASTM 039 Concrete Compressive Strength - Curing, handling, and <br />testing of 4"x8" concrete test cylinders (200 cylinders at $32/cylinder) <br />3. Change Order Total: <br />CONTRACT SUMMARY <br />1. Original contract amount: <br />2. Previous change order amounts: <br />3. Contract amount prior to this change order: <br />4. Contract increase by this change order amount: <br />5. New contract amount, including this change order: <br />Authorized Signature Date <br />AMOUNT <br />$8,910.00 <br />$6,400.00 <br />$15,310.00 <br />AMOUNT <br />$35,335.00 <br />$0.00 <br />$35,335.00 <br />$15,310.00 <br />$50,645.00 <br />--e5--z(1 <br />Date <br />Please sign the original Contract Change Order and return to American Engineering Testing, Inc., Project Manager. <br />5548 Barthel Industrial Drive, Suite 500 Albertville, MN 55301 <br />Phone (763) 428-5573 I (800) 972-6364 I Fax (65i) 659-1379 I teamAET.com I AAIEEO <br />This document shall not be reproduced, except in full, without written approval from American Engineering Testing, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.