My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/12/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 08/12/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:27:26 AM
Creation date
8/9/2024 8:32:52 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/12/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Ramsey — Ramsey Water Treatment Plant <br />AET Proposal No, P-0021454 <br />April 10, 2023 <br />Page 6 of 8 <br />TL1IHc <br />We estimate I trip will be required to complete the test -roll observations of the pavement <br />subgrades. <br />REPORTING <br />Reports presenting the results of our observations and testing services will be provided <br />periodically during the various phases of construction. At the completion of construction, <br />we will issue a final report summarizing the results of all observations and testing services, <br />if requested. <br />ESTIMATED FEES <br />Our services will be provided on a unit cost basis according to the unit rates provided in <br />the attached Fee Schedule tabulation. Our monthly invoices will be determined by <br />multiplying the number of personnel hours or tests by their respective unit rates. We have <br />also estimated a total cost which we anticipate will be required to complete the previously <br />described observations and testing services. This estimated total cost is based on our <br />experience with similar projects. Our estimated total cost will be $35,335.00. We refer <br />you to the attached Fee Schedule for an itemization of how we arrived at this estimated <br />cost. We reserve the right to review our estimate after reviewing the final project <br />structural plans and project specifications. <br />We caution that this is only an estimated cost. Often, variations in the overall cost of the <br />services occur due to reasons beyond our control, such as construction change orders, <br />weather delays, changes in the contractor's schedule, unforeseen conditions or retesting <br />of services. These variations will affect the actual invoice totals, either increasing or <br />decreasing our total costs for the project from those estimated in this proposal. If more <br />time or tests are required, additional fees may be needed to complete the project testing <br />services. , If less time or tests are needed, a cost savings will be realized. We will not, <br />however, exceed the estimated total cost for the project without first obtaining your <br />authorization. <br />TERMS AND CONDITIONS <br />The Terms and Conditions listed in Master Service Agreement between the City of <br />Ramsey and AET, dated January 23, 2023, apply to this project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.