My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/12/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 08/12/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:27:26 AM
Creation date
8/9/2024 8:32:52 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/12/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Armstrong Boulevard will only exist until the eventual extension of 157th Avenue NW at the northeast corner of <br />the site. At that time, Anoka County and the City will require the Applicant to construct a new driveway onto <br />157th Avenue NW and vacate the previous driveway onto Armstrong Boulevard. More information on Anoka <br />County's review can be found in the review letter attached to this case. <br />Minimum parking requirements for assembly uses, including religious institutions, are one space for each three <br />seats of design capacity. The building's main assembly space is designed for 500 occupants, which results in a <br />minimum parking requirement of 167 stalls. The Applicant is proposing to construct 261 stalls, which exceeds the <br />minimum requirement by 56.29 percent (94 stalls) and exceeds the maximum allowable parking supply by 41.85 <br />percent (77 stalls), but the Applicant stated the need for additional stalls to meet the parking demand of the <br />proposed building, based on their current operations in Ham Lake. In addition to the 261 parking stalls, the <br />Applicant is proposing a drop-off area in front of the main entrance. There are no on -street overflow parking <br />opportunities. <br />Pedestrian access to the site will come from a shared -use trail along the west side of Armstrong Boulevard. A new <br />walkway will be built to connect the building's main entrance to this shared -use trail. Other walkways will <br />encircle most of the building to provide access from the parking lot to each of the building's entrances, as required <br />by the Minnesota State Building Code. <br />Landscape Plan <br />As noted in the Environmental Policy Board's (EPB) staff report from July 15th, the Landscape Plan is generally <br />acceptable. However, Staff did note various minor corrections that are needed (see attached Landscape Plan). <br />Staff has suggested adding some taller growing evergreen shrubs in between the deciduous trees along the north <br />side of the parking lot. These additional plantings will aid with shielding headlight glare into the abutting <br />residential property. Staff has also requested a 3-5 year maintenance plan for the area proposed to be established <br />with a native seed mix. Having a maintenance plan will be beneficial for the property owner in ensuring that the <br />seed mix not only gets established but in preventing unwanted vegetation (weeds) from taking over the area. <br />Irrigation is not proposed (nor is it required). However, turf establishment is proposed to be accomplished <br />through seeding. Staff has requested more information on how the areas seeded will be watered to ensure <br />germination and establishment of turf. <br />Utilities <br />The building will be connected to municipal water through a service line that will connect to an existing valve at <br />the northeast corner of the site. Connecting to the City's watermain will be more cost-effective for the building's <br />fire protection needs than a well's tank and pump system. Since sanitary sewer is unavailable to the site, as it is <br />outside the MUSA, the building will use a septic system to handle sewer needs. <br />Storm Water Management <br />There will be an on -site storm water management basin constructed southwest of the parking lot to handle runoff <br />from the entire site. The stormwater plan will require Lower Rum River WMO review. <br />Preliminary Plat <br />The Subject Property is currently unplatted. To accommodate the proposed development, a preliminary plat is <br />needed to ensure the proposed site improvements will fit within the proposed lot. The proposed subdivision would <br />create two parcels: an 8.93-acre parcel (Lot 1, Block 1) to accommodate the proposed church development, and a <br />0.47-acre outlot to be deeded to the City for future trail development along the Lake Itasca corridor, satisfying a <br />portion of the park dedication requirements. Additionally, there would be right-of-way dedication for the south <br />half of future 157th Avenue NW at the northeast corner of the subdivision. By dedicating the 33-foot-wide <br />section for 157th Avenue NW now, the right-of-way is preserved for its eventual connection to Eland Street to the <br />north. The Nordvik Addition, which directly abuts the Subject Property to the north, planned for the eventual <br />replatting of property within it, which would then require the Eland Street right-of-way to extend south through <br />the site to serve all newly -created lots. The 157th Avenue extension would then serve as the southern connection <br />of Eland Street to provide neighborhood connectivity, which would improve public safety and street maintenance <br />routes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.