Laserfiche WebLink
6. 10. <br />CC Regular Session New <br />Meeting Date: 08/12/2024 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />Title: <br />Adopt Resolution #24-209 Approving Change Order No. 2 for Improvement Project #21-08, Water Treatment <br />Plant Trunk Watermain Improvements <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #24-209 approving Change Order No. 2 for Improvement Project <br />#21-08, Water Treatment Plant Trunk Watermain Improvements. <br />Background: <br />During construction, field changes were required to various existing and proposed watermain lines at the <br />intersection of 143rd Avenue and County Road 56 / Ramsey Boulevard to avoid directional drilling under County <br />Road 56 / Ramsey Boulevard under traffic. The proposed trunk watermain will instead be installed in an open <br />trench when County Road 56 / Ramsey Boulevard is closed to traffic during the reconstruction of Ramsey <br />Boulevard as part of the Ramsey Gateway project. <br />Field changes will also be required to convert 143rd Avenue from a 7-ton design to a 9-ton design to meet State <br />Aid standards. <br />The attached Change Order includes detailed information on the required field changes made to existing pay <br />items and on new pay items not included in the contract. Revised plan sheet 31 is attached to the Change Order to <br />provide visual details on scope of the required field changes that were already constructed. <br />As always, staff strives to process change orders before work is completed. However, after -the -fact change order <br />approvals are sometimes required to avoid even larger project costs resulting from contractor downtime while <br />waiting for the next Council meeting to obtain approval before work is completed. This typically costs thousands <br />to tens of thousands of dollars for each day work is halted. <br />Funding Source: <br />Change Order No. 2 results in increased project costs amounting to $141,608.93. <br />These costs will be funded from water enterprise funds. <br />Recommendation: <br />Staff recommends adopting Resolution #24-209. As previously noted, some of the work has already been <br />completed. <br />Outcome/Action: <br />Adopt Resolution #24-209 approving Change Order No. 2 for Improvement Project #21-08, Water Treatment <br />Plant Trunk Watermain Improvements in the amount of $141,608.93. <br />Attachments <br />