My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/12/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 08/12/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:27:26 AM
Creation date
8/9/2024 8:32:52 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/12/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK AND STAGING AREAS: Contractor shall confine their work activities within the right <br />of way at all times. No equipment shall be left on city streets outside normal working hours. <br />Equipment may be stored overnight on City owned property at 14100 Jasper Street NW (secured <br />storage available) upon approval by the City. <br />TRAFFIC CONTROL: Contractor will be required to follow the most current edition of the <br />Temporary Traffic Control Zone Layout Manual. <br />SPECIFICATION REFERENCES: Contractor shall conduct all work in conformance with the <br />specifications set forth herein and in accordance with the most current edition of the Minnesota <br />Department of Transportation Standard Specifications for Construction, which is incorporated by <br />reference to these specifications. <br />PAYMENT: Partial payments will not be issued. Final payment will be made upon submittal of <br />final pay request to the City on a net 30-day basis following City acceptance of all work items <br />included on the pay request. An IC 134 form will be required prior to final payment. <br />BASIS OF PAYMENT: Payment shall be made for all components of the work as specified in <br />this RFQ. The cost of any additional equipment, labor, materials, permits, tools, and supplies <br />which have not been specifically identified in this RFQ for payment, but are required to complete <br />the work, shall be considered incidental to the project. <br />3 <br />RFQ — 2024 SPRAY PATCHING CONTRACTED SERVICES <br />STREET MAINTENANCE PROJECT #24-57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.