My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/12/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 08/12/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:27:26 AM
Creation date
8/9/2024 8:32:52 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/12/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Regular Meeting Minutes dated January 16, 2024 <br />Motion carved. Voting Yes: Chairperson Musgrove, Councilmembers Olson and Howell. Voting <br />No: None. <br />5. COMMITTEE BUSINESS <br />5.01: Consider Trail Connection between Bowers Drive and Riverstone South <br />City Engineer/Public Works Director Westby reviewed the staff report and stated that staff <br />recommends constructing trail improvements between Bowers Drive and Riverstone South to <br />allow Bowers Drive residents to more easily and safely access "The Hollow" park in Riverstone <br />South, as well as the trails along Riverdale Drive and Mississippi River Trail south of Highway <br />10. Staff has received comments from several Bowers Drive residents that they would now <br />appreciate a trail connection to the neighborhood park in Riverstone South, the trails along <br />Riverdale Drive, and the Mississippi River Trail. <br />Parks and Assistant Public Works Director Riverblood clarified that the trail would not just serve <br />the Bowers Drive residents as it would also provide better connection throughout the larger trail <br />system in addition to providing connection around the neighborhood. <br />Chairperson Musgrove asked if there is a sidewalk on Snowy Owl Street that goes in front of the <br />park and asked how the trail would connect. <br />Parks and Assistant Public Works Director Riverblood commented that there are sidewalks on all <br />non -cul-de-sac streets in the new development. He stated that along Snowy Owl there is a ten - <br />foot bituminous trail. <br />City Engineer/Public Works Director Westby explained how the proposed trail would connect. <br />Councilmember Olson asked if the width of ten feet is standard. <br />City Engineer/Public Works Director Westby replied that ten feet is the current standard while <br />older trails may be a width of eight feet. <br />Parks and Assistant Public Works Director Riverblood explained how the updated standard was <br />determined and noted that most of the eight -foot trails are being converted to ten feet as they <br />receive maintenance overlays. <br />Councilmember Howell stated that originally the residents on Bowers Drive were opposed to the <br />connection because they did not want foot traffic in their neighborhood. She noted that this <br />connection would seem to increase foot traffic. <br />City Engineer/Public Works Director Westby commented that he would expect that some <br />Riverstone South residents would choose to walk down to Bowers Drive. <br />Public Works Committee / February 20, 2024 <br />Page 2 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.