My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/12/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 08/12/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:27:26 AM
Creation date
8/9/2024 8:32:52 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/12/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the site, each spaced at least 150 feet from the centerlines of Pearson Street and Snowy Owl Street, across <br />Riverdale Drive from the site. This spacing will help facilitate safer traffic patterns into and out of the Subject <br />Property. <br />The west building is designed to have the main retail entrance at its southeast corner, adjacent to the customer <br />parking and close to the west driveway. The climate -controlled self -storage portion of the west building will have <br />a separate entrance and loading area along the east side of the building. This building will be three stories tall, <br />with a maximum roof height of 38.25 feet and a top -of -parapet height of 42.25 feet. <br />The east building is designed for U-Haul's U-Box storage, which consists of pod -like storage containers stacked <br />inside the building. This building will have its main entrance facing westward, adjacent to customer parking stalls. <br />There will also be a loading dock along the south side of the building. This building will technically be one story <br />tall, although the clearance height will be taller to accommodate the stacking of the U-box units. This building will <br />have a maximum roof height of 45 feet and a top -of -parapet height of 47.5 feet. <br />The five garage -style buildings along the north side of the site will each have twenty garage doors (ten on each <br />long side), resulting in 100 garage -style storage units. These buildings are not proposed to be climate -controlled, <br />and there will be no dedicated parking stalls for any of these five buildings. However, there will be 30-foot-wide <br />drive aisles between each of these buildings to allow for customers to drive up to their respective storage unit to <br />load and unload items. <br />Lastly, the check -in canopy is proposed to be located in the center of the site, just north of a 200-foot-long <br />staging area for rental trucks and trailers. This canopy is intended to be the "landing spot" for customers looking <br />to return rental equipment. The canopy will be built for drive -through operations, and will have a clearance height <br />of 14 feet, which will accommodate all of U-Haul's rental trucks and trailers. Each of these buildings will be 10 <br />feet tall. <br />Architecture and Building Elevations <br />All seven buildings are designed to consist primarily of insulated metal panels (Metl-Span Santa Fe) with a stucco <br />appearance. This material is considered an "other material as may be approved by the Planning Commission and <br />City Council given the building's use and context." Metals otherwise are limited to an accent material on the <br />building. The panels proposed by the Applicant will have a higher level of finish than traditional metal panels. <br />Accent materials include lyrical articulated accent fins (in orange, lime green, and teal), dark -brown walnut lap <br />siding, tilt -up concrete, and metal trim. The west building will also have storefront windows on the second and <br />third floors at all four corners of the building, as well as a storefront window design on the first floor at the <br />southeast corner of the building, surrounding the retail showroom. The garage doors on the west and east <br />buildings will consist of ultra -grain walnut material, whereas the garage doors on the north storage buildings will <br />be orange metal, similar to the company's branding. <br />Signage <br />The east and west buildings are proposed to have signage that meets City Code reqirements. No signage is <br />proposed to be installed on the garage -style buildings and no freestanding, monument, or directional signs are <br />proposed. If the Applicant chooses to add any additional signs to the site, they will be subject to regulations in <br />City Code. <br />Parking <br />The site is not expected to have a large need for employee and visitor parking. Most of the parking on site will <br />be for the rental vehicles and trailers. A condition is included in the CUP resolution that requires the installation <br />of "no parking" signs along Riverdale Drive so that trucks and trailers are not parked off site. <br />Landscaping Plan <br />As noted in the Environmental Policy Board's (EPB) staff report from July 15th, the submittal includes a <br />Landscape Plan for the project. The landscaping is focused primarily along the east and west sides of the Subject <br />Property as well as along Riverdale Drive. Staff requested various minor revisions to the original plan set, and it <br />
The URL can be used to link to this page
Your browser does not support the video tag.