Laserfiche WebLink
Irrigation Notes + Requirements: <br />PLANT SCHEDULE <br />Landscape Notes + Requirements: <br />CHECK AND VERIFY ALL EXISTING AND PROPOSED SITE CONDITIONS, UTILITIES AND SERVICES PRIOR TO TRENCHING. <br />LATERAL PIPING TO BE A MINIMUM OF 12 INCHES DEEP AND MAINLINES A MINIMUM OF 18 INCHES DEEP. <br />HEADS, VALVES, AND ROTORS. MATCH EXISTING <br />SUBMIT IRRIGATION PRODUCT DATA TO OWNER FOR REVIEW AND APPROVAL. <br />USE TEFLON TAPE ON ALL THREADED JOINTS. <br />IRRIGATION LINE LOCATIONS SUBJECT TO CHANGE IN THE FIELD, AS CONTRACTOR DEEMS NECESSARY. <br />SUBMIT LAYOUT PLAN AND PRODUCT DATA TO THE OWNER FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION. <br />IRRIGATION MECHANICALS TO INCLUDE BOILER DRAIN BEFORE BACKFLOW DEVICE FOR WINTERIZATION. <br />IRRIGATION DESIGN TO INCLUDE A QUICK -COUPLE VALVE ON THE MAIN BEFORE THE FIRST VALVE FOR WINTERIZATION. <br />IRRIGATION IS NOW ALLOWED IN THE BIOFILTRATION BASIN. <br />ENSURE THE IRRIGATION SYSTEM INCLUDES A WIRED RAIN SENSOR, PER STATE PLUMBING CODE. <br />OBTAIN A PERMIT AS REQUIRED BY THE CITY FOR THE IRRIGATION SYSTEM. INCLUDE COST OF PERMIT IN BID. <br />6 4 • 6 r, 6 • °,2 ,d2 A c7i AAAA <br />"ii , , 4 4 0, •0 N , N <0 0. '' , ,-', 7,,- ,,,,, ,,,,, ,,, <br />i'. <br />5 <br />§ <br />SYMBOLCODE BOTANICAL NAME <br />3 3 3 3 <br />Thornless Cockspur <br />Crataegus crus-galli inerrnis <br />Plan takes precedence over plant schedule if discrepancie <br />All proposed plants shall be located and staked as shown. <br />°L <br />Malus x 'Spring Snow' <br />Ivory Silk Japanese Tree Lilac <br />Syringe reticulata Ivory Silk' <br />3 3 3 3 3 3 3 <br />N N <V <V <br />soil and compaction conditions are adequate to allow for proper drainage at and around the <br />4 6 6 F <br />Auhrmn Blaze. Freeman Maple <br />emanii .Jeffersred. <br />f, <br />tsia triacanthos inermis 'Skycole- TM Skyline Thornless Honey Locust <br />7,EJ <br />Quercus rubra <br />6 <br />S- <br />410 t$0 <br />411t, AIL Aik <br />I <br />11„ <br />14. The landscape contractor shall be responsible for obtaining any permits and coordinating inspections as required throughout the work process. <br />(5), <br />A* ' <br />17. All edger shall be Commercial Grade 5" Black Polyethylene with 1" bull -nose. Anchor every 48. on -center (minimum). Submit edger sample. <br />!sant' Redosier Dogwood <br />Juniperus chinensis -Sea Green' <br />`.1 <br />Compact American Cranberry Bush <br />INCLUDE A SEPARATE WATER METER FOR IRRIGATION USE FROM THE CITY. INCLUDE COST IN BID. <br />Iroquis Beauty Black Chokeberry <br />Aronia melanocarpa ' Morton' TM <br />g is scheduled to occur. Corrections required by the city must <br />25. The landscape contractor shall contact Gopher State One Call no less than 48 hours before digging for field utility locations. <br />es, and additional information regarding the project. <br />28. See Site and Civil plans for grading, <br />29. Topsoil per City of Ramsey required detail ERO-6 for topsoil requirements. Slope away from building. <br />30. Landscape contractor must prove the open sub -grade of a <br />water per hour prior to installation of plant materials, topso <br />4" diameter X 48" depth holes augured every 36" on-cente <br />compliance to infiltration minimum requirement. <br />31. Fencing (if noted) per Architect's Plans and Specifications. <br />LCH - 4" DEEP - SEE LANDSCAPE NOTES <br />