My WebLink
|
Help
|
About
|
Sign Out
Home
Resolution - #92-08-199 - 08/25/1992
Ramsey
>
Public
>
Resolutions
>
1992
>
Resolution - #92-08-199 - 08/25/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 12:54:26 PM
Creation date
8/12/2024 11:46:10 AM
Metadata
Fields
Template:
Resolutions & Ordinances
Resolutions or Ordinances
Resolutions
Resolution or Ordinance Number
#92-08-199
Document Date
08/25/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. <br /> <br />11. <br /> <br />12. <br /> <br />13. <br /> <br />14. <br /> <br />16. <br /> <br />17. <br /> <br />All construction of on-site bituminous surfaces with concrete curbing shall be completed as <br />presented on the approved site plan, attached hereto as Exhibit A. Bituminous surfacing of <br />143rd Avenue N.W. and Jaspar Street N~W. shall be completed, or a surety for same in the <br />amount of Thirty Seven Thousand Dollars ($37,000.00) shall be provided at the City, prior <br />to the issuance of the conditional use permit. The financial surety may be in the form of <br />cash or an irrevocable Letter of Credit or some other form of financial guarantee acceptable <br />to the City. <br /> <br />All on-site lighting and signage shall meet all City Code requirements and the approval of <br />City Staff prior to any installations. <br /> <br />Hours of operation for all levels of site activity shall be limited to 7:00 a.m. through 5:00 <br />p.m. Monday through Saturday. Any variance from these hours of operation shall require <br />prior special approval by the City Administrator or his/her designated representative. The <br />City Council shall be notified of the temporary change in hours. Any change of hours of <br />operation shall not exceed the standards as addressed by the MPCA permit. <br /> <br />Crushing operations will be conducted a minimum of one time per year. A maximum of <br />two crashing periods are allowed per calendar year. Each crushing period shall not exceed <br />10 weeks in duration. Should either an emergency, equipment failure, weather, or any <br />other unforeseen event cause the crushing operation to cease, the crushing operation shall <br />not extend beyond the 10 week period except in accordance with procedures as outlined in <br />Condition Item 4/12. <br /> <br />The permittee of the crushing facility shall notify the City by letter at least one week prior to <br />each crushing period. The notification shall indicate when crushing will begin and how <br />long it will last. The notification shall also indicate the name(s) of the person(s) who will <br />be supervising the facility and a contact phone number. <br /> <br />Should a situation arise pertaining to noise, dust, or any other health, safety, or general <br />public welfare issues, the City may contact the MPCA or other qualified environmental <br />testing companies or agencies to investigate the situation. All testing will be at the owners <br />expense. <br /> <br />The official permit issued by the MPCA is hereby incorporated by reference into these <br />conditions and made a part of this Conditional Use Permit as if fully set forth herein. <br />However, where the City and MPCA standards conflict, the more stringent standards shall <br />apply. <br /> <br />Noise standards shall be the same as those set forth in the MPCA standards and, for any <br />regulated matters not covered in the MPCA standards, the League of Minnesota Cities <br />Model Noise Ordinance standards as established for 1990 shall apply. Dust shall be <br />controlled by Bury and Carlson, Inc. in the following manner: <br /> <br />ao <br /> <br />A water truck will be stationed on the premises at all times. The permittee shall be <br />responsible for wetting down the areas where the trucks are hauling material to <br />lessen the dust caused by the traffic. <br /> <br />bo <br /> <br />The permittee shall locate spray nozzles on the crusher. The water from these spray <br />nozzles will lessen the dust created when old concrete and asphalt are reduced in the ' <br />crusher. The permittee shall also install and use spray nozzles on the conveyors to <br />lessen the dust caused by the transportation of the finished product from the crusher <br />to the stockpile. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.