Laserfiche WebLink
I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />i <br />I <br />I <br />I <br />I <br /> <br />I <br /> <br />23. <br /> <br />24, <br /> <br />25. <br /> <br />26. <br /> <br />27. <br /> <br />28. <br /> <br />29. <br /> <br />30. <br /> <br />31. <br /> <br />32. <br /> <br />water Quality. Surface and ground waters originating outside and passing through or <br />adjagenl:ito the Site and runoff water discharged from the Site shall, at its point of depamu~ <br />fromthe Site, meet ail applicable federal and state water quality standards as they exist from <br />time,to time during the period of this CUP. The operator shall perform any water treatment <br />necessary to comply with applicable state and federal water quality standards as they exist <br />fror/i, time to time during the period of this CUP. Grading and drainage plans shall be <br />subrriitted to and approved by the City Engineer. Berming shall be installed as necessary to <br />control run-off. <br /> <br />Screening. The Permit Holder agrees to screen the aluminum processing facility from <br />any @ublic street. Such screening shall be achieved using grading, landscape elements, <br />and/Or plant materials which will achieve up to 90% opacity. Supplemental screening of <br />the Site may be ordered by the City to comply with the then current screening requirements <br />for outside storage on industrial property. <br /> <br />Off, Street Parking. Off-street parking shall be provided such that there is at least one <br />parking space for each employee on the maximum working shift plus three spaces for <br />visitor parking. <br /> <br />Surfacing of Work Areas. All storage areas, parking areas and driveway areas shall <br />be surfaced with bituminous or concrete. <br /> <br />Building Permits. No construction or remodeling of any structures shall commence <br />priorlto the issuance of a building permit by the City Building Official and site plan <br />approval by the City Council. <br /> <br />Eleogrical. The building's electrical system must be inspected and brought up to code <br />withi,fl 30 days of this CUP. An affidavit of compliance shall be filed with the City within <br />five working days after final inspection. <br /> <br />Sanitary Se,ver. The Permit Holder shall petition for City sewer and water within. 30 <br />days Of the date of action on this CUP. In the event that the petition fails, the Permit <br />HoldOr shall install an on-site system or submit an alternative sewage handling treatment <br />plan ft)r Council approval. <br /> <br />Scope and Conduct of Operations. The operations permitted by this CUP may be <br />perfon'ned on the Subject Property in conformance with existing statutory and regulatory <br />authority' and requirements of the City, Anoka County, Minnesota ("County"), and the <br />Minn6sota Pollution Control Agency CMPCA"). <br /> <br />Furnaces. This permit shall be issued allowing for the use of two melt furnaces as <br />described by the applicant in the CUP application support information. An increase in <br />furnace capacity or a third melt furnace shall not be added to the operation without <br />application and approval of a new CUP. <br /> \ <br />ClosUre Due to CUP Revocation, Other Cir'~:.umstances. In the event this CUP <br />is revoked or the Permit Holder closes operation of the aluminum processing operation for <br />any re~ason, including but without limitation, order of the court or other agency of <br />competent jurisdiction, bankruptcy, insolvency, or abandonment, the Permit Holder shall <br />immed~iat¢ly proceed to remove all feedstock and other material from the site. In the event <br />the Pei-mit Holder fails to comply with the terms of this CUP, the City may, upon 30 days' <br />writtefi notice to the Pernfit Holder enter into the property and perform all such obligations, <br />the costs of which shall be borne by the Permit Holder or, in default thereof, by its surety. <br /> <br /> <br />