Laserfiche WebLink
permanent pool volume based on pond geometry and inlet, outlet (invert or outlet control), <br /> and emergency overflow/spillway elevations. <br /> The City will attempt to calculate load-based removal efficiencies to analyze the treatment <br /> effectiveness of ponds to determine whether opportunities exist to upgrade the functionality of <br /> ponds in areas where additional treatment may benefit receiving waters. <br /> This Policy will be evaluated annually to determine if changes to the frequencies or scopes of <br /> work are required. <br /> Please contact Bruce Westby, City Engineer/ Public Works Director, at 763-433-9863 or <br /> bwestby@cityoframsey.com with any questions regarding this Policy. <br />