Laserfiche WebLink
10. <br /> <br />11. <br /> <br />12. <br /> <br />13. <br /> <br />plantings with City day labor and/or by letting contracts and draw upon the escrow for <br />payment. Only the City Administrator shall have the authority to direct replacement of <br />the plantings and withdraw from the escrow account. The Permittee hereby grants <br />permission and a license to the City and/or its contractors and assigns to enter upon the <br />Site for the purpose of replacing plantings in the event of the Permittee's default. <br /> <br />Prior to the issuance of a building permit for the tower, the Permittee shall supply the <br />City with affirmation that the proposed tower will comply with any applicable regulations <br />administered by the Federal Aviation Administration and a report from a qualified and <br />licensed professional engineer which demonstrates the tower's compliance with structural <br />and electrical (but not radio frequency) standards, as described in Section 9.15.16 of the <br />Ramsey City Code. <br /> <br />The chain link security fence shall be installed and maintained in accordance with the <br />approved site plan to prevent unauthorized entry to the site. <br /> <br />In the event the tower is not removed within 12 months of the cessation of operations at <br />the site, the tower and associated facilities may be removed by the City and the costs of <br />removal assessed against the Permittee. In the event the Permittee fails to remove the <br />tower and associated facilities as required herein, the City shall provide notice to the <br />Permittee of the default condition and establish a thirty (30) day time frame in which the <br />Permittee may remedy the default condition. If the Permittee fails to do so within the 30 <br />day time frame, the City Administrator or his/her designee may order the removal with <br />City day labor and/or by letting contracts for said removal. Only the City Administrator <br />or his/her designee shall have the authority to direct the removal and assess the costs to <br />the property owner. The Permittee hereby grants permission and a license to the City <br />and/or its contractors and assigns to enter upon the Subject Property for the purpose of <br />removing structures and equipment in the event of the Permittee's default. <br /> <br />No part of the proposed use will at any time extend across or over any part of the public <br />right-of-way, public street, highway, sidewalk, or recreational trail. <br /> <br />The tower and related equipment will meet the Commercial (Business) district's setback <br />requirements. <br /> <br />The tower and related equipment will not be located between a principal structure and a <br />public street. <br /> <br />The tower will not exceed the Commercial (Business) district's height limit for towers. <br /> <br />The tower will not be illuminated by artificial means and shall not display strobe lights. <br /> <br />No signs will be posted on the tower, equipment cabinets or fencing except applicable <br />warning or equipment information signs. <br /> <br />RESOLUTION #98-07-161 <br /> Page 3 of 5 <br /> <br /> <br />