My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/27/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 08/27/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:30:37 AM
Creation date
8/28/2024 4:20:00 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/27/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. 15. <br /> CC Regular Session New <br /> Meeting Date: 08/27/2024 <br /> Primary Strategic Plan Initiative: Address infrastructure needs. <br /> Title: <br /> Adopt Resolution#24-231 approving Change Order#3 for Halls Dover Acres Street Reconstructions, <br /> Improvement Project#24-02 <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolution#24-231 approving Change Order#3 for Halls Dover Acres Street <br /> Reconstructions, Improvement Project#24-02. <br /> Background: <br /> Trunk Watermain Scope: <br /> Included in the Halls Dover Acres Street Reconstructions project is the extension of approximately 1,265 lineal <br /> feet of 12-inch trunk watermain between Potassium Street east of 157 th Lane and Sodium Way adjacent to <br /> Sunfish Lake Boulevard. This connection is included within the 10-year Capital Improvement Program and 20240 <br /> Comprehensive Plan. <br /> Revised Watermain Scope: <br /> At the July 9, 2024 City Council meeting, Council adopted Resolution#24-185 approving Change Order#2 for <br /> this project. The change order adjusted the trunk watermain route to continue the line down Sunfish Lake <br /> Boulevard, and connect at 155th Avenue/Sodium Street. At the time of the change order, staff s understanding <br /> was the line at 155th Avenue and Sunfish Lake Boulevard was an 8-inch line. The change order included reducing <br /> the 12-inch trunk watermain line down to 8-inch, and making an 8-inch wet tap into the existing line. A 12-inch <br /> line between this connection and Sodium Way would need to be considered in the future. <br /> During construction of the work included under Change Order#2, it was discovered the existing 12-inch line, <br /> which was thought to end at the intersection of Sodium Street and Sodium Way,remained 12-inch through the <br /> intersection of Sunfish Lake Boulevard and 155th Avenue/Sodium Street. This was not known previously due to <br /> the incorrect Alpine Acres as-built maps, and the reduction to 8-inches occurring under the west side of Sunfish <br /> Lake Boulevard,before the first valve to the west. In reaction, Change Order#3 kept the trunk line 12-inches and <br /> connected to the existing 12-inch line at 155th Avenue/Sodium Street, resulting in completion of the 12-inch <br /> loop,with future considerations no longer being required. <br /> Construction Impacts. <br /> Change Order#3 includes the cost for re-stocking the 8-inch wet tap and supplying the 12-inch wet tap. In today's <br /> manufacturing environment,watermain wet taps of this size are not kept on-hand and require special ordering to <br /> obtain. <br /> Notification: <br /> Notification is not required. <br /> Time Frame/Observations/Alternatives: <br />
The URL can be used to link to this page
Your browser does not support the video tag.