My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/27/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 08/27/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:30:37 AM
Creation date
8/28/2024 4:20:00 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/27/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Councilmember introduced the following resolution and moved for its adoption: <br /> RESOLUTION#24-231 <br /> RESOLUTION ACCEPTING CHANGE ORDER #3 FOR HALLS DOVER ACRES <br /> STREET RECONSTRUCTIONS, IMPROVEMENT PROJECT #24-02 <br /> WHEREAS, the City of Ramsey proposes to reconstruct the streets within the Halls Dover Acres <br /> subdivision; and <br /> WHEREAS,pursuant to Ramsey City Council Resolution#23-198, adopted August 22,2023,the <br /> City Council ordered the City Engineer to prepare plans and specifications for said improvements; and <br /> WHEREAS,pursuant to Ramsey City Council Resolution#24-014, adopted January 9, 2024, the <br /> City Council approved final plans and specifications as prepared by the City Engineer and authorized <br /> advertisement for bids for the same improvements; and <br /> WHEREAS, pursuant to Ramsey City Council Resolution #24-064, adopted February 26, 2024, <br /> Dave Perkins Contracting of Nowthen,Minnesota,was awarded the construction contract in the amount of <br /> $844,919.01 for the total bid construction of the improvements in accordance with the approved plans and <br /> specifications and advertisement for bids; and <br /> WHEREAS, pursuant to Ramsey City Council Resolution #24-097, adopted April 9, 2024, City <br /> Council approved Change Order No.l increasing construction costs by $2,253.00 for the purpose of <br /> allowing the connection to City water service as requested by the residents at 6014 157'Lane NW; and <br /> WHEREAS, pursuant to Ramsey City Council Resolution #24-185, adopted July 9, 2024, City <br /> Council approved Change Order No.2 increasing construction costs by $81,775.05 for the purpose of <br /> connecting the trunk watermain to the existing watermain located at 155'Avenue NW; and <br /> WHEREAS, during construction, it has been found that the existing watermain pipe size called <br /> out in the as-builts for the proposed connection location at 155'Avenue is not correct; and <br /> WHEREAS, a 12-inch wet tap was required and the 8-inch wet tap required re-stocking; and <br /> WHEREAS, Change Order No.3 increases construction costs by $10,560.00 for the purpose of <br /> completing the trunk watermain connection to the existing watermain located at 155'Avenue NW. <br /> NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF <br /> RAMSEY, ANOKA COUNTY, STATE OF MINNESOTA: <br /> 1) The City Council hereby approves Change Order #3 in the total amount of$10,560.00 for Dave <br /> Perkins Contracting to complete the trunk watermain connection to the existing watermain located <br /> at 155'Avenue NW. <br /> The motion for the adoption of the foregoing resolution was duly seconded by Councilmember <br /> and upon vote being taken thereon, the following voted in favor thereof: <br /> and the following voted against the same: <br />
The URL can be used to link to this page
Your browser does not support the video tag.