Laserfiche WebLink
(26 trees and 264 shrubs) x cost/planting ($300/tree and $75/shrub) x 30% average non-survival <br /> rate], which shall be in effect for a two (2) year period commencing on the date of the CITY's <br /> written acceptance of said plantings as part of the Required Improvements. <br /> At the end of the two(2)year period,the PERMITTEE shall contact the CITY to schedule a filial <br /> inspection of the landscaping. The determination that all plantings that have been planted in <br /> accordance with the Plans have either survived or have been replaced shall be made by the CITY. <br /> Upon approval of the final landscape inspection by the CITY,the maintenance guaranty shall be <br /> returned to the PERMITTEE. In the event the PERMITTEE fails to maintain the required <br /> plantings for a two (2) year period, the City Council may order the replacement of plantings with <br /> CITY day labor and/or by letting contracts and draw upon the escrow for payment. Only the City <br /> Council shall have the authority to direct replacement of the plantings and withdraw from the <br /> escrow account. The PERMITTEE hereby grants permission and a license to the CITY and/or <br /> its contractors and assigns to enter upon the Subject Property for the purpose of replacing <br /> plantings in the event of the PERMITTEE default. <br /> SECTION Iv <br /> GENERAL <br /> 17. Boulevard and Area Restoration. The PERMITTEE shall be responsible for restoring all areas <br /> disturbed by the development grading operation in accordance with the approved erosion and <br /> sediment control plan. The PERMITTEE shall also be responsible for the cost of cleaning any <br /> soil, earth or debris from the wetlands within and adjacent to the Subject Property resulting from <br /> grading performed in the development of the land. <br /> 18. Zeolite Street Boulevard Trees. Zeolite Street will be reconstructed as a CITY project in 2024. <br /> In lieu of the PERMITTEE planting trees ahead of the road project being complete, the <br /> PERMITTEE will pay $7,800.00 to cover the cost of installing twelve (12) boulevard trees and <br /> sod based on 440 feet of lot frontage along Zeolite Street with trees spaced at 35 feet on center with <br /> a typical cost of$650.00 per tree(installed). <br /> 19. Parking Lot Grading. It is acknowledged that the design and grade of the pat-king lot and storm <br /> sewer are dependent upon the final design and elevation of Zeolite Street. The PERMITTEE shall <br /> provide updated site plans for review once the roadway design is finalized. <br /> 20. Construction Site Maintenance. The PERMITTEE shall adhere to all CITY ordinances relating <br /> to, but not limited to, dumping of garbage, site development, construction debris, open burning, <br /> etc. <br /> 21. Construction, Hours and Entrance Signs. The CITY restricts construction and delivery hours <br /> to Monday through Saturday 7:00 a.m. to 10:00 p.m. The PERMITTEE is required to provide a <br /> sign at each entrance point stating delivery and construction operation hours. Said signs are not to <br /> exceed eighty(80)square feet in size and must be clearly visible at all times during the construction <br /> period. <br /> 22. Estimated Cost. It is understood and agreed that cost amounts set forth in this Agreement as <br /> Required Improvements, unless specified as fixed amounts, are estimated. The PERMITTEE <br /> agrees to pay the entire cost of said improvements including interest,engineering and legal charges. <br /> 23. Site Plan Approval Expenses. The PERMITTEE agrees that it will pay to the CITY all CITY <br /> expenses incurred in the approval of the Site Plan, including, but not limited to administration <br /> Ramsey Properties,LLC/Home2Suites <br /> Development Agreement <br /> Page 5 of 8 <br />