Laserfiche WebLink
PERSONNEL COMPLEMENT <br /> Public Works Superintendent 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Secretary(Formerly under Engineering) 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Mechanic 2.00 2.00 2.00 2.00 3.00 3.00 <br /> Street Supervisor - - 1.00 1.00 1.00 1.00 <br /> Streets Lead Worker 1.00 1.00 1.00 1.00 1.00 1.00 <br /> PIN Maintenance Worker 5.00 5.00 5-00 5.00 8.00 8.00 <br /> Temporary-Streets 0.50 0.50 0.50 0.50 0.50 0.50 <br /> Street Maintenance Total 10.50 10.50 11.50 11.50 15.50 15.50 <br /> 6488/6489 Other Contracted Services <br /> Pavement Management Program Funding(Transfer to Pavement Managery 260,742 300,0000 - - - <br /> Cracks ealing/Rejuvenation/Pothole Patching 239,258 162,784 200,000 1,272,595 555,000 <br /> Curb Repair/Tree Removal - - 15,000 20fl00 <br /> 500,000 462,784 215,000 1,2720595 5751000 <br /> 6540-Heavy Machinery <br /> F350 truck with plow(2021&2022 total cost) - 116,891 103,199 <br /> 2-Single Axis Plow Trucks - 544)318 <br /> Tandem Axle Truck with Plow less trade in$15,000 - 266,007 <br /> 721 G Front End Loader 226,000 <br /> - 1160891 103,199 266)007 770,318 <br /> 6550-Motor Vehicle <br /> 1-ton truck - 62,772 <br /> 2-3/4 ton trucks with plows(I new&1 replacement) - - 64,066 <br /> F550 44 Truck with 9'2"V-plow (New)with lift gate 1091000 <br /> - 62,772 64,066 109,00❑ <br /> 6580-Other Equipment <br /> Sidewalk Machine - 162,723 <br /> Snow Pusher Box for Front End Loader 23500 <br /> Trailer for skidsteer - 15,102 <br /> Toolcat 36,105 <br /> Skidsteer - 57,372. <br /> Tire balancer(1/2 cost other 1/2 police) 9,453 <br /> Asphalt floater 14,405 <br /> ExMark Mower(less$2,500 trade in) 17,500 <br /> Pull behind PTO Mower(Less$1,000 trade in) 27,000 <br /> Trailer Mounted Boom Lift 58)000 <br /> Bobcat T66 Skidsteer 811000 <br /> Scissor Lift JLG 2646 26500 <br /> 10-Foot Slide in Removable Salt/Sander Spreader(Truck Mounted) 14,000 <br /> Hydraulic hose Crimping Machine 15,000 <br /> 271)302 2%858 231500 194,500 44,500 <br /> DESCRIPTION OF SERVICES: <br /> The Street Maintenance Department is responsible for maintaining city streets, <br /> sidewalks,traffic signs,boulevards,ROW mowing and the storm water collection <br /> system. <br /> .J <br /> BUDGET HIGHLIGHTS <br /> • Market Rate Adjustments-From 3.03%-13.85% <br /> COLA&Steps <br /> Restrict public access at Public Works main entry and brace front desk- <br /> $12,000 <br /> $45,,000 additional funding for streetmaintenance improvements- <br /> $600,000 tota I <br /> • Replace 2015 Kubota mower(less$2,500 trade in)-$17,500 <br /> • Replace 2004 Landpride pull behind mower(less$1,000 trade in)-$27,000 <br /> -42- <br />