My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/10/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 09/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:33:04 AM
Creation date
9/11/2024 11:55:43 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/10/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. 6. <br /> CC Regular Session New <br /> Meeting Date: 09/10/2024 <br /> Primary Strategic Plan Initiative: Improve the safety and mobility of transportation corridors. <br /> Title: <br /> Adopt Resolution#24-243 Approving Amended Cooperative Construction Agreement#1052605-1 for <br /> Improvement Project#20-11, Ramsey Gateway Highway 10 Improvements <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolution#24-243 approving amended MnDOT Cooperative Construction <br /> Agreement No. 1052605AO I for Improvement Project#20-11,Ramsey Gateway Highway 10 Improvements. <br /> Background: <br /> Construction of grade-separation improvements on CSAH 56 (Ramsey Blvd) and CSAH 57 (Sunfish Lake Blvd) <br /> at the BNSF Railway and U.S. Highway 10 crossings are underway to improve traffic operations and safety. The <br /> proposed improvements, designated as Improvement Project#20-11, Ramsey Gateway Highway 10 <br /> Improvements, were designed and are being constructed in partnership with the City of Ramsey,Anoka County <br /> and the Minnesota Department of Transportation(MnDOT). <br /> The proposed improvements generally include reconstructing portions of U.S. Highway 10/169, CSAH <br /> 56/Ramsey Boulevard, CSAH 57/Sunfish Lake Boulevard, and Riverdale Drive; constructing new frontage roads <br /> to remove private accesses onto Highway 10; constructing sidewalks,trails and pedestrian curb ramps; <br /> constructing bridges and roundabouts; extending/reconstructing municipal utilities; constructing a temporary <br /> traffic control signal system; establishing turf; and installing striping and signing. <br /> Construction of the Ramsey Gateway Highway 10 Improvements project began in the Summer of 2023 with <br /> temporary widening improvements, and is proposed to conclude in 2026. The vast majority of work will occur in <br /> 2024 (primarily on Sunfish Lake Boulevard) and 2025 (primarily on Ramsey Boulevard). <br /> To memorialize cost sharing and maintenance responsibilities for the Ramsey Gateway Highway 10 <br /> Improvements, the City of Ramsey adopted Resolution#23-238 on September 26, 2023, authorizing the Mayor <br /> and City Administrator to enter into updated MnDOT Cooperative Construction Agreement No. 1052605, a copy <br /> of which is attached. <br /> On August 16, 2024, MnDOT submitted proposed amended Cooperative Construction Agreement No. <br /> 1052605A01 to City staff. The amended agreement contains revisions related to new bridge and non-motorized <br /> trail maintenance including adding Exhibit E to Article 1.6,revising Article 5.5, adding Articles 5.11, 5.12, 6.5, <br /> 6.6 and 6.7, and revising Article 8. Per the attached cover letter, MnDOT has requested that the City <br /> electronically sign the signature page and submit it with a supporting resolution. The same request has been <br /> made of Anoka County. <br /> Time Frame/Observations/Alternatives: <br />
The URL can be used to link to this page
Your browser does not support the video tag.