Laserfiche WebLink
DocuSign Envelope ID:2C36256F-94DE-4874-8COF-3A4C509DAAD2 <br /> MnDOT Contract No.: 1052605 <br /> control, signing, pavement markings, and any other maintenance activities necessary to perpetuate the <br /> trails in a safe and usable condition. The LUP, currently LUP 0202-0108,will address additional <br /> maintenance and liability responsibilities for the nonmotorized trail. <br /> 5.6. Retaining Walls. Maintenance of retaining wall construction as shown on Exhibit C—Wall Maintenance. <br /> Maintenance includes graffiti removal and any other maintenance activities necessary to perpetuate the <br /> walls in a safe, usable, and aesthetically acceptable condition. <br /> 5.7. Noise Walls. Maintenance of the non-highway side of noise wall construction as shown on Exhibit C—Wall <br /> Maintenance. Maintenance includes vegetation control,graffiti removal on the non-highway side, and any <br /> other maintenance activities necessary to perpetuate the walls in a safe, usable, and aesthetically <br /> acceptable condition. <br /> 5.8. Signing. Exhibit A—Signing Ownership and Maintenance shows the signs that will be maintained by the <br /> City according to City maintenance practices. <br /> 5.9. Lighting. Maintenance and ownership of lighting facilities construction as shown on Exhibit D— Lighting <br /> Maintenance. Maintenance of electrical lighting systems includes everything within the system,from the <br /> point of attachment to the power source or utility,to the last light on the feed point, including but not <br /> limited to re-tamping of lighting units or replacing of LED luminaires, repair or replacement of all damaged <br /> luminaire glassware, loose connections, luminaires when damaged or when ballasts fail, photoelectric <br /> control on luminaires, defective starter boards or drivers, damaged fuse holders, blown fuses, knocked <br /> down poles including wiring within the poles, damaged poles, pull boxes, underground wire, damaged <br /> foundations, equipment pad, installation of approved splices or replacement of wires, repair or extending <br /> of conduit, lighting cabinet maintenance including photoelectric cell,electrical distribution system,Gopher <br /> State One Call (GSOC) locates, and painting of poles and other equipment.The City will be responsible for <br /> the hook up cost and application to secure an adequate power supply to the service pad or pole and will <br /> pay all monthly electrical service expenses necessary to operate the lighting facility. <br /> 5.10.Additional Drainage. No party to this Agreement will drain any additional drainage volume into the storm <br /> sewer facilities constructed under the construction contract that was not included in the drainage for <br /> which the storm sewer facilities were designed, without first obtaining written permission to do so from <br /> the other party. <br /> 6. Maintenance by the County <br /> Upon completion of the Project,the County will provide the following without cost or expense to the State: <br /> 6.1. Storm Sewers. Routine maintenance of storm sewer facilities construction as shown on Exhibit B— <br /> Drainage Ownership and Maintenance. Routine maintenance includes, but is not limited to, removal of <br /> sediment, debris,vegetation, and ice from grates and catch basins, and any other maintenance activities <br /> necessary to preserve the facilities and to prevent conditions such as flooding, erosion, or sedimentation, <br /> this also includes informing the District Maintenance Engineer of any needed repairs. <br /> 6.2. Signing. Exhibit A—Signing Ownership and Maintenance shows the signs that will be maintained by the <br /> County according to County maintenance practices. <br /> 6.3. Retaining Walls. Maintenance of retaining wall construction as shown on Exhibit C—Wall Maintenance. <br /> Maintenance includes graffiti removal and any other maintenance activities necessary to perpetuate the <br /> walls in a safe, usable, and aesthetically acceptable condition. <br /> 6.4. Additional Drainage. No party to this Agreement will drain any additional drainage volume into the storm <br /> sewer facilities constructed under the construction contract that was not included in the drainage for <br /> which the storm sewer facilities were designed, without first obtaining written permission to do so from <br /> the other party. <br /> -g- <br /> Payable Standard <br />