Laserfiche WebLink
DocuSign Envelope ID:2C36256F-94DE-4874-8COF-3A4C509DAAD2 <br /> MnDOT Contract No.: 1052605 <br /> snow, ice, debris, and graffiti removal, pavement marking maintenance, and signing maintenance.The <br /> City will own and maintain non-standard (aesthetic) elements such as decorative lighting, ornamental <br /> metal railing and any elements later added to the bridge. Maintenance of the aesthetic elements <br /> includes, but is not limited to,graffiti removal and other routine maintenance activities necessary to <br /> perpetuate the aesthetic elements in a safe, usable, and aesthetically acceptable condition. <br /> C. State Responsibilities. The State will perform structural inspections and major maintenance of the <br /> bridges without any cost to the County. Major maintenance includes all structural related maintenance, <br /> including expansion joint flushing, deck crack sealing, crack sealing trails on the bridge and on approach <br /> panels, painting, overlays, redecking and rehabilitation of the bridge, concrete bridge approach panels, <br /> and structurally-supported signing on the bridge.The State will be responsible for maintenance of all <br /> guardrails on TH 10 below the bridges, roadway signing that is attached to the bridges for the purpose <br /> of TH 10 traffic, non-ornamental fencing on the Trunk Highway Right-of-Way, and graffiti removal <br /> within the control of access below the bridges.The State will determine the safe load rating for the <br /> bridges.The State will provide emergency response for traffic hits and restitution from insurance <br /> companies or private parties who have damaged the bridges. <br /> 9. State Cost and Payment by the State <br /> 9.1. State Cost. The State's cost for grading, bituminous surfacing,ADA improvements, retaining walls, noise <br /> walls, high tension cable guardrail,TMS, lighting, and roundabouts construction is defined in the <br /> construction plan and the attached Schedule "I" and is reflective of the Participation Distribution prepared <br /> by the Office of State Aid for Local Transportation. <br /> A. State Federal-Aid Funds and State Match to the Federal-Aid Funds.$3,200,000.00 is the State Federal- <br /> Aid funded portion and $800,000.00 is the State Match to the State Federal-Aid funds of the State <br /> construction cost share and will be paid to the County through the State Aid Finance Office under the <br /> Delegated Contract Process (State Aid Manual, Chapter 5.3).The State Federal-Aid funds and State <br /> match to Federal-Aid funds will be capped at$4,000,000.00. <br /> B. State SRC Funds. $8,000,000.00 is the capped amount of the estimated State funded construction cost <br /> share and will be paid to the County through the State Aid Finance Office under the Delegated Contract <br /> Process (State Aid Manual, Chapter 5.3). <br /> C. State Bond Funds. $10,350,337.45 is the capped amount of the estimated State bond funded <br /> construction cost share and will be paid to the County through the State Aid Finance Office under the <br /> Delegated Contract Process (State Aid Manual, Chapter 5.3). <br /> 9.2. Limitations of State Payment;No State Payment to Contractor. The State's participation in the contract <br /> construction is limited to the estimated amounts shown in Article 10.1, and the State's participation will <br /> not change except by a mutually agreed written amendment to this Agreement.The State's payment <br /> obligation extends only to the County.The County's contractor is not intended to be and will not be <br /> deemed to be a third-party beneficiary of this Agreement.The County's contractor will have no right to <br /> receive payment from the State.The State will have no responsibility for claims asserted against the <br /> County by the County's contractor. <br /> 9.3. Schedule "1". The Preliminary Schedule "I" includes all anticipated State participation construction items <br /> covered under this Agreement. The Preliminary Schedule "I" is based upon estimated quantities and <br /> estimated unit prices. After the construction contract is awarded,the State will prepare a Revised Schedule <br /> "I" based on construction contract unit prices and based upon the Participation Distribution prepared by <br /> the Office of State Aid for Local Transportation.The Revised Schedule "I" will replace and supersede the <br /> Preliminary Schedule "I". <br /> -10- <br /> Payable Standard <br />