Laserfiche WebLink
6. 11. <br /> CC Regular Session New <br /> Meeting Date: 09/10/2024 <br /> Primary Strategic Plan Initiative: Improve the safety and mobility of transportation corridors. <br /> Title: <br /> Adopt Resolution#24-251 Approving Change Order No. 23 for Improvement Project#20-11,Ramsey Gateway <br /> Highway 10 Improvements <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolution#24-251 approving Change Order No. 23 for Improvement Project <br /> #20-11, Ramsey Gateway Highway 10 Improvements. <br /> Background: <br /> In 2023, construction began on the Ramsey Gateway Highway 10 project,which includes grade separation of <br /> Highway 10 at the intersections of Sunfish Lake Boulevard and Ramsey Boulevard, frontage road improvements <br /> on both sides of Highway 10, and grade separation of the Burlington Northern Santa Fe (BNSF)railway crossings <br /> of Ramsey Boulevard and Sunfish Lake Boulevard. Construction of this project is scheduled for completion by <br /> the Spring of 2026. <br /> Numerous City utilities have been and will continue to be constructed and/or reconstructed as part of this project <br /> per the approved construction plans. However, during construction, revisions are sometimes required to account <br /> for unforeseen conditions in the field, or to provide for future considerations that were unknown at the time the <br /> plans were prepared and approved. <br /> Change Order No. 23 addresses such required revisions as identified in this case and in attached Change Order <br /> No. 23,which has been signed by representatives of the Minnesota Department of Transportation(MnDOT) and <br /> the Contractor. <br /> In summary,buried sheet pile was encountered during the excavation for sanitary sewer manhole#20. The buried <br /> sheet pile was in conflict with the proposed sanitary sewer alignment and needed to be removed in order to install <br /> the proposed sanitary manhole and sewer pipe. The Contractor therefore had to remove the buried sheet pile in <br /> order to install the proposed sanitary manhole and sanitary sewer pipe per the approved plans. <br /> Time Frame/Observations/Alternatives: <br /> Observations: <br /> This was an unforeseen condition and the Extra Work was necessary in order to construct the proposed sanitary <br /> sewer improvements per the approved plans. <br /> Alternatives: <br /> Adopt Resolution#24-251 approving Change Order No. 23 for Improvement Project#20-11, Ramsey Gateway <br /> Highway 10 Improvements. <br /> Funding Source: <br /> The Extra Work associated with Change Order No. 23 results in a lump sum project cost increase of$68,137.15. <br /> Sanitary sewer funds are proposed to pay for this Extra Work. <br />