Laserfiche WebLink
have either survived or have been replaced. Upon approval of this final inspection, the <br /> landscape maintenance guaranty shall be returned to the PERMITTEE. In the event the <br /> PERMITTEE fails to maintain the required plantings for a two-year period, the City <br /> Council may order the replacement of plantings with CITY day labor and/or by letting <br /> contracts and draw upon the landscape maintenance guaranty for payment. Only the City <br /> Council shall have the authority to direct replacement of the plantings and draw upon the <br /> landscape maintenance guaranty. The PERMITTEE hereby grants permission and a <br /> license to the CITY and/or its contractors and assigns to enter upon the Subject Property <br /> for the purpose of replacing plantings in the event of the PERMITTEE's default. <br /> 16. Street Cleaning and Clean Up. After the street surfacing that is a part of the Stage I <br /> Improvements is installed,the PERMITTEE shall clear any soil, earth, or debris from the <br /> streets. From time to time,the CITY may remove accumulations of soil,earth,and debris <br /> from the streets resulting from the construction of the Stage I Improvements. It shall be <br /> the PERMITTEE'S responsibility to pay the costs associated with this necessary street <br /> cleaning. Invoices from the CITY to the PERMITTEE for such costs shall be paid within <br /> fifteen(15) days of the date of the invoice. <br /> 17. Payment of Development Fees. The PERMITTEE must pay to the CITY the fees <br /> described on Exhibit B which may include, but are not limited to, Park Land Dedication <br /> Fees, Trail Development Fees, Sanitary Sewer Connection (Trunk) Fees, Water <br /> Connection (Trunk) Fees, Sanitary Sewer Lateral Fees, Water Lateral Fees, Storm Water <br /> Management Fees, Street Signage Fees,and Street Light Operation and Maintenance Fees. <br /> It is acknowledged that development fees (Park Dedication, Trail Development, Sanitary <br /> Sewer Connection (Trunk), Water Connection (Trunk), and Storm Water Management) <br /> were paid previously for RTC 7th Addition for 190 units. Only eighty-eight(88)units were <br /> built, leaving a credit for 102 additional units. This Plat includes thirty (30)units, which <br /> means credit for seventy-two (72) additional units in future phases are still available. <br /> 18. Requirements for Building and Occupancy Permits. <br /> a. No building permit for any lot in the Plat shall be issued until the PERMITTEE <br /> has: (a) installed a Class 5 driving surface to within 300 feet of the structure; (b) <br /> provided the CITY Building Official with a Certificate of Survey; c.)the financial <br /> guaranty described in Section 12 to the CITY; d.) obtained all necessary permits <br /> from the Lower Rum River Watershed Management Organization and has <br /> provided a copy of such permit to the CITY; and <br /> b. No occupancy permit for any lot in the Plat shall be issued until the PERMITTEE <br /> has: (a)constructed vehicular access to the lot,including the installation of at least <br /> one layer of bituminous surfacing; (b) constructed all utilities and storm water <br /> facilities this Agreement requires to serve the lot and such utilities and storm water <br /> facilities are in place, operational and accepted by the CITY; (c)for lots that have <br /> a slope of less than 2%,provided the CITY with a certificate of grading,prepared <br /> by a licensed (State of Minnesota) professional land surveyor, certifying that the <br /> flattest grade on the lot is 1% or greater; and(d) installed and planted the sod and <br /> landscaping that are required as a part of the Stage I Improvements. <br /> C. Model Home Permits. Model homes shall be located on Lots 1-12,Block 1 (2, 6- <br /> unit buildings). Building permits for the model homes shall not be issued until <br /> 5 <br />