Laserfiche WebLink
7. 2. <br /> CC Regular Session <br /> Meeting Date: 03/26/2024 <br /> Primary Strategic Plan Initiative: Address infrastructure needs. <br /> Information <br /> Title: <br /> Adopt Resolution#24-086 Accepting Bids and Awarding Contract for Improvement Project#23-19, COR <br /> Infrastructure Improvements <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolution#24-086 accepting bids and awarding a contract for Improvement <br /> Project#23-19, COR Infrastructure Improvements, to Douglas-Kerr Underground, L.L.C. in the amount of <br /> $21973,047.22. <br /> Background: <br /> On February 21,2023,the Public Works Committee (PWC)reviewed The COR Analysis Update as prepared by <br /> Bolton and Menk, Inc. and identified the following immediate COR Infrastructure priorities; <br /> •Grading, lining and installing storm sewer for the Waterfront stormwater pond, <br /> •Filling low-lying COR properties using fill from the Waterfront pond excavation, <br /> •Reconstructing Zeolite Street, <br /> •Reconstructing and realigning the north end of Center Street, and <br /> •Constructing Ramsey Parkway between the Sunwood Drive roundabout and Willemite Street. <br /> During the February 28, 2023, City Council work session, Council confirmed these priorities by consensus. Based <br /> on the identified priorities, Bolton and Menk, Inc. prepared the attached COR Infrastructure Design Services <br /> Proposal to identify the associated scope of services and estimated costs required for design services, as well as <br /> estimated construction costs. Per the attached proposal, completing the following work tasks in 2023 would help <br /> to achieve the identified priorities; <br /> •Grading, lining and installing storm sewer for the Waterfront stormwater pond, <br /> •Filling low-lying COR properties using fill from the Waterfront pond excavation, <br /> •Design and prepare plans and specifications for Zeolite Street, <br /> •Design and prepare plans and specifications for the north end of Center Street, and <br /> •Design and prepare plans and specifications for Ramsey Parkway between the Sunwood Drive roundabout <br /> and Willemite Street. <br /> In the Summer of 2023, all trees were cleared from The COR, allowing mass grading to occur. This work was <br /> designated as Improvement Project#23-17, COR Tree Clearing. <br /> In the Fall of 2023,the Waterfront pond was graded and lined, all low-lying parcels in The COR were filled to <br /> specified elevations using structural fill material excavated from the pond after documenting and compacting all <br /> underlying soils, salvaged topsoil was spread on the newly placed and compacted fill, and turf was established. <br /> This work was designated as Improvement Project#23-20, COR Mass Grading. <br /> At the December 12, 2023, City Council work session,the City Council directed staff to work with Bolton and <br /> Menk to prepare final plans and specifications for Improvement Project#23-19, COR Infrastructure <br /> Improvements, with the intent of constructing the improvements in 2024. The proposed improvements include <br /> reconstructing Zeolite Street between Sunwood Drive and Bunker Lake Boulevard, constructing Ramsey Parkway <br />