My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/26/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 03/26/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:12:13 AM
Creation date
9/11/2024 12:39:40 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/26/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRAUN Project Proposal <br /> INTERTEC J <br /> QTB193063 <br /> The Science You Build On. Ramsey -COR Infrastructure Improvements CP 23-19 <br /> Client: Work Site Address: Service Description: <br /> City of Ramsey Intersection of Zeolite St NW Construction Materials Testing <br /> Bruce Westby and Ramsey Pkwy City Project No.23-19 <br /> 7550 Sunwood Dr NW Ramsey, MN 55303 <br /> Ramsey,MN 55303 <br /> (763)427-1412 <br /> Description Quantity Units Unit Price Extension <br /> Phase 1 Construction Materials Testing <br /> Activity 1.1 Soils Testing $15,606.00 <br /> 207 Compaction Testing-Nuclear 66.00 Hour 94.00 $67204.00 <br /> Work Activity Detail Qty Units Hrs/Unit Extension <br /> Utilities 12.00 Trips 3.00 36.00 <br /> Subgrade Preparation/Common Embankment 10.00 Trips 3.00 30.00 <br /> 1308 Nuclear moisture-density meter charge,per hour 66.00 Each 28.00 $1,848.00 <br /> 209 Sample pick-up 8.00 Hour 94.00 $752.00 <br /> 1318 Moisture Density Relationship(Standard),per sample 6.00 Each 200.00 $17200.00 <br /> 1162 Sieve Analysis with 200 wash,per sample 20.00 Each 156.00 $31120.00 <br /> 1530AG Asphalt Content of Aggregate Base,per sample 1.00 Each 162.00 $162.00 <br /> 1228 Topsoil Testing with nutrients,per sample 2.00 Each 410.00 $820.00 <br /> 1861 CMT Trip Charge 30.00 Each 50.00 $17500.00 <br /> Activity 1.2 Concrete Testing $219564.00 <br /> Concrete Testing 114.00 Hour 94.00 $10,716.00 <br /> Work Activity Detail Qty Units Hrs/Unit Extension <br /> Sidewalk 15.00 Trips 3.00 45.00 <br /> Curb and Gutter 15.00 Trips 3.00 45.00 <br /> Pavement/Apron/Driveway 6.00 Trips 3.00 18.00 <br /> Headwall Structure 2.00 Trips 3.00 6.00 <br /> 1364 Compressive strength of concrete cylinders(ASTM C 39),each 190.00 Each 38.00 $7,220.00 <br /> Work Activity Detail Qty Units Hrs/Unit Extension <br /> Sidewalk 15.00 Trips 5.00 75.00 <br /> Curb and Gutter 15.00 Trips 5.00 75.00 <br /> Pavement/Apron/Driveway 6.00 Trips 5.00 30.00 <br /> Headwall Structure 2.00 Trips 5.00 10.00 <br /> 278 Concrete Cylinder Pick up 12.00 Hour 94.00 $17128.00 <br /> 1861 CMT Trip Charge 50.00 Each 50.00 $2,500.00 <br /> Activity 1.3 Pavement Testing $83904.00 <br /> 209 Sample pick-up 16.00 Hour 94.00 $1,504.00 <br /> 2689 MnDOT Asphalt Verification,per sample 8.00 Each 740.00 $57920.00 <br /> 1542 Thickness and Density of Bituminous Core 18.00 Each 60.00 $1,080.00 <br /> 1861 CMT Trip Charge 8.00 Each 50.00 $400.00 <br /> Activity 1.4 Project Management and Review $83356.00 <br /> 138 Project Assistant 18.00 Hour 94.00 $17692.00 <br /> 226 Project Manager 36.00 Hour 174.00 $61264.00 <br /> 228 Senior Project Manager 2.00 Hour 200.00 $400.00 <br /> Phase 1 Total: $54,430.00 <br /> 03/12/2024 01:32 PM Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.