My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/26/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 03/26/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:12:13 AM
Creation date
9/11/2024 12:39:40 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/26/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOLTON 7533 Sunwood Drive NV11 <br /> QD <br /> Suite 206 <br /> ia & MENK Ramsey, M N 55303-5119 <br /> Real People. Real Solutions. Ph: (763) 433-2851 <br /> Fax: (763) 427-0833 <br /> Bolton-Menk.com <br /> April 7, 2023 <br /> Mr. Bruce Westby, P.E. <br /> City Engineer/ Director of Public Works <br /> City of Ramsey <br /> 7550 Sunwood Drive NW <br /> Ramsey, Minnesota 55303 <br /> RE: City of Ramsey-The COR Public Infrastructure Design Services <br /> Dear Mr. Westby: <br /> We have prepared a scope of services and fee estimate for design services associated with public <br /> infrastructure improvements in The COR. We understand the City is considering constructing the <br /> following improvements: <br /> • The Waterfront pond grading, lining, and related storm sewer improvements, <br /> • Earthwork related to placing fill excavated from the Waterfront onto various lots located within <br /> The COR. <br /> • Zeolite Street from Sunwood Drive to Bunker Lake Boulevard, <br /> • Center Street from 146t"Avenue to Bunker Lake Boulevard, and <br /> • Ramsey Parkway from Willemite Street to Sunwood Drive. <br /> The initial concepts and strategies were detailed in The COR report update, completed in 2023. Our <br /> proposal is based upon carrying these concepts and principles forward into the design phase. Each <br /> street segment will include public utilities (sanitary sewer and water main), along with storm sewer, <br /> trails, and sidewalks.The COR report included costs associated with street lighting, but those <br /> improvements are not considered in this proposal as the work is assumed to be completed by the utility <br /> company under a separate contract. <br /> REALIZED BENEFITS <br /> The proposed improvements will provide several benefits to the area when completed. Understanding <br /> these benefits will be important to ensure that City dollars are maximized. Generally,the final product <br /> will provide the following benefits: <br /> • Installed and functional City infrastructure within The COR, including, streets, sanitary sewer, <br /> water main, storm sewer and pedestrian facilities, <br /> • The construction of Ramsey Parkway will allow for completion of the east-west corridor through <br /> the center of The COR, <br /> C:\Users\kevinki\Desktop\COR Design 2023\New folder\Ramsey COR Area Design 04072023.docx <br /> Bolton&Menk is an equal.opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.