My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/26/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 03/26/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:12:13 AM
Creation date
9/11/2024 12:39:40 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/26/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Illustration of spacer beam <br /> CD <br /> Treated spacer beam to consist of 4 x 4 blocks +/- 5" high, placed 2' o.c. Treated 2 x 4 <br /> joint(s) to be centered over blocks—however, top and bottom 2 x 4 joints to alternate <br /> when possible. <br /> Spacer beams shall be placed on the existing edges of the 6' boardwalk, and a third down <br /> the center. The spacer beam shall be 8" in total height, and may be greater in areas if <br /> needed to level for the new decking, and less for the north 30' of the boardwalk. Shims <br /> to account for undulation in the surface of the existing boardwalk, shall be placed under <br /> the spacer beam such that the new 8' decking shall be uniformly flat and screwed to the <br /> continuous new treated material of the top of the spacer beam. <br /> 6 1 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.