My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/24/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 09/24/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:34:17 AM
Creation date
10/8/2024 11:30:19 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/24/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INVOICE <br />NORTHDALE CONST. CO. INC. <br />9760 71st St NE -Albertville, MN 55301 <br />Office: 763-428-4868 <br />Fax: 763-428-4997 <br />BILLED TO: <br />Short Elliott Hendrickson, Inc. <br />Attn: David Hutton, PE <br />10650 Red Circle Drive, Suite 500 <br />Minnetonka, MN 55343 <br />INVOICE DATE: <br />INVOICE# <br />OUR JOB # <br />PLAN SHEET # <br />PLAN STATION # <br />JOB NAME: <br />LOCATION: <br />HOUSE # / STREET: <br />DATE OF WORK: <br />9/13/2024 <br />202403-XI0 <br />2024-03 <br />34 <br />131+00 to 132+65 <br />Trunk WM Improvement <br />Ramsey <br />143rd Ave NW <br />8/26/24 to 9/3/24 <br />DESCRIPTION OF WORK: <br />From Station 131+00 to Station 132+65, we hit concrete that was above and below pipe grade. In order to fix this, we <br />ended up taking out a 165' L x 8' W x 5' D area that was enough to pull the box and get our pipe in. We had to rent a <br />Komatsu PC360 backhoe with a hydraulic hammer for the beginning of the concrete removal process which was time <br />consuming. We then used a CAT 349F Backhoe and a CAT 950K Loader to remove and load the concrete rubble into the <br />trucks to haul out. The concrete had a 1 1/2" diameter rebar along with a thick cable that was embedded within the <br />concrete. On top of the concrete there were core samples as well. Once we removed the concrete, we placed bedding <br />sand under the pipe, then installed the pipe. Jacobs Trucking was used to stockpile sand on -site, haul out concrete rubble <br />to Martin Marietta and bring back bedding sand from Sauters. The concrete was hard enough to wear over 1 7/8" of bit off <br />of the hydraulic hammer. We also burned 283.6 gallons of diesel fuel in the rental machine. <br />QUANTITY UNIT <br />29.50 Hour <br />31.50 Hour <br />DESCRIPTION <br />LABOR COSTS <br />Backhoe Operator <br />Loader Operator <br />EQUIPMENT COSTS <br />11.00 Hour Cat 349 Backhoe <br />1.00 LS Komatsu PC360 Backhoe <br />w/Hydraulic Hammer (Rental) <br />283.60 Gal Diesel fuel for Rental Backhoe <br />31.50 Hour Cat 950K Loader <br />5.50 Hour Ingersol Rand Compactor <br />20.00 Hour Jacobs Trucking <br />Questions concerning this Invoice? <br />Call: Philip B. Lesnar <br />(763) 428-4868 <br />UNIT PRICE <br />$106.07 <br />$103.66 <br />$512.61 <br />$25,213.22 <br />$3.38 <br />$264.80 <br />$92.51 <br />$155.00 <br />SUBTOTAL: <br />10% Markup <br />BALANCE DUE: <br />MAKE ALL CHECKS PAYABLE TO: <br />Northdale Construction Co., Inc. <br />9760 71 st St NE <br />Albertville, MN 55301 <br />AMOUNT <br />$3,129.07 <br />$3,265.29 <br />$5,638.71 <br />$25,213.22 <br />$958.57 <br />$8,341.20 <br />$508.81 <br />$3,100.00 <br />$50,154.86 <br />$5,015.49 <br />$55,170.34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.