My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/24/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 09/24/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:34:17 AM
Creation date
10/8/2024 11:30:19 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/24/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Councilmember introduced the following resolution and moved for its adoption: <br />RESOLUTION #24-277 <br />RESOLUTION APPROVING CHANGE ORDER NO. 4 TO NORTHDALE CONSTRUCTION <br />FOR IMPROVEMENT PROJECT #21-08, WATER TREATMENT PLANT TRUNK <br />WATERMAIN IMPROVEMENTS <br />WHEREAS, pursuant to Ramsey City Council Resolution #23-305 adopted November 28, 2023, <br />a construction contract was awarded to Northdale Construction Co. Inc., of Albertville, Minnesota, in the <br />amount of $6,671,414.00 for said improvements; and <br />WHEREAS, during construction, field changes were required at the intersection at Center Street <br />and Bunker Lake Boulevard to relocate a fire hydrant out of the bike trail at a total cost of $11,472.53; <br />and <br />WHEREAS, during construction, field changes were required on the east side of Ramsey <br />Boulevard at 143rd Avenue when an unused 6-inch water service was discovered requiring the contractor <br />to remove the service and gate valve and to plug the stub at a total cost of $13,893.21; and <br />WHEREAS, during construction, field changes were required at 7060 143rd Avenue when a 6- <br />inch sewer service conflict was discovered requiring the contractor to cut the riser down to avoid a <br />conflict with the new 20" watermain at a total cost of $7,942.55; and <br />WHEREAS, during construction, field changes were required at Jasper Street and 143rd Avenue <br />when a major storm sewer conflict was discovered requiring additional watermain fittings to lower the <br />watermain to avoid the conflict at a total cost of $42,019.15; and <br />WHEREAS, during construction, field changes were required at station 115+18 on 143rd <br />Avenue to avoid an existing 6" sewer service requiring additional curb and gutter to be removed and <br />replaced, and watermain had to be realigned to avoid storm sewer and a catch basin, at a total cost of <br />$12,165.49; and <br />WHEREAS, during construction, field changes were required at North Commons Park when <br />additional wire was needed to connect the flow meter to the cabinet due to field changes for the final <br />cabinet location as directed by City staff at a total cost of $875.44; and <br />WHEREAS, during construction, field changes were required to install 2 temporary mailboxes at <br />a total cost of $630.00; and <br />WHEREAS, Change Order No. 4 documents the required field changes completed and required <br />by Northdale Construction for improvement project #21-08, WTP Trunk Watermain Improvements, in the <br />amount of $88,998.37. <br />NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF <br />RAMSEY, ANOKA COUNTY, STATE OF MINNESOTA, as follows: <br />Resolution #24-277 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.