Laserfiche WebLink
BILLED TO: <br />Short Elliott Hendrickson, Inc. <br />Attn: David Hutton, PE <br />10650 Red Circle Drive, Suite 500 <br />Minnetonka, MN 55343 <br />INVOICE <br />NORTHDALE CONST. CO. INC. <br />9760 7lst St NE -Albertville, MN 55301 <br />Office: 763-428-4868 <br />Fax: 763-428-4997 <br />INVOICE DATE: <br />INVOICE# <br />OUR JOB # <br />PLAN SHEET# <br />PLAN STATION # <br />JOB NAME: <br />LOCATION: <br />HOUSE # I STREET: <br />DATE OF WORK: <br />8/9/2024 <br />202403-CO 3 d <br />2024-03 <br />32 <br />110+18 <br />Trunk WM Improvement <br />Ramsey <br />143rd Ave / Jasper St <br />7/25/24 & 7/29/24 <br />DESCRIPTION OF WORK: <br />At Jasper St and 143rd Ave, we ran into storm sewer pipe that was not on our plans but were on the cities plans. This <br />caused a major conflict with our 20" Watermain. To remedy this, we had to order 4- 20" 45° bends to do an offset. This <br />resulted in downtime trying to find fittings that were readily available. We were able, after numerous hours to locate (4) <br />20" 45 degree bends. They were brought to the site later in the afternoon but too late in the day to continue working into <br />the intersection. The guys worked on building the offsets. While working on the offset, there were Fiber Optic lines <br />running along side us and a power line crossing the road at an angle close to the storm sewer which made it more difficult <br />to dig and get a regular trench box in. With all the different utilities in such a tight area we had to use multiple smaller <br />boxes and metal sheeting to protect the trench and also utilities from caving in. Slow going through this intersection. This <br />work was performed over a 2 day period. <br />QUANTITY UNIT <br />DESCRIPTION <br />LABOR COSTS <br />16.00 Hour <br />3.00 Hour <br />16.00 Hour <br />Foreman <br />Foreman - OT <br />Backhoe Operator <br />3.00 Hour Backhoe Operator - OT <br />16.00 Hour Loader Operator <br />3.00 Hour Loader Operator - OT <br />16.00 Hour Pipelayer <br />3.00 Hour Pipelayer - OT <br />16.00 Hour <br />3.00 Hour Bottomman - OT <br />16.00 Hour Bottomman <br />3.00 Hour Bottomman - OT <br />Bottomman <br />EQUIPMENT COSTS <br />12.00 Hour Cat 349 Backhoe <br />12.00 Hour Cat 950K Loader <br />2.00 Hour Ingersol Rand Compactor <br />19.00 Hour Pickup Truck <br />UNIT PRICE AMOUNT mi <br />$121.22 <br />$168.38 <br />$106.07 <br />$145.65 <br />$103.66 $1,658.56 <br />$142.02 $426.06 <br />$107.42 $1, 718.72 <br />$150.19 $450.57, <br />$104.06 $1,664.96 <br />$145.15 $435.4 5 <br />$1 ,939.52 <br />$505.14 <br />$1,697.12 <br />$436.95 <br />$103.06 $1,648.96 <br />$144.15 $432.45 <br />$512.61 <br />$264.80 <br />$92.51 <br />$51.38 <br />$6,151.32 <br />$3,177.60 <br />$185.02 <br />$976.22 <br />MATERIAL COSTS <br />,220.00 LBS 20" 45° Bend (4 Bends 305 lb/ea) $10.68 $13,029.60 <br />35.56 SY Insulation $36.98 $1,315.01 <br />1 00 LS , Delivery Fee $350.00. $350.00 <br />Questions concerning this Invoice? <br />Call: Philip B. Lesnar <br />(763) 428-4868 <br />SUBTOTAL: <br />10% Markup <br />$38,199.23 <br />$3,819.92 <br />BALANCE DUE: <br />$42,019.15 <br />MAKE ALL CHECK$ PAYABLE TO: <br />Northdale Construction Co., Inc. <br />9760 71st St NE <br />Albertville, MN 55301 <br />