My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/24/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 09/24/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:34:17 AM
Creation date
10/8/2024 11:30:19 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/24/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />z <br />PROJECT LOCATION <br />1-MILE BOUNDARY <br />IMPAIRED, SPECIAL OR PROTECTED WATERS <br />NATIONAL WETLANDS INVENTORY <br />z <br />0 <br />CC Z <br />LU LLI <br />> <br />< LL-1 <br />z <br />0 <br />0 — <br />1— I— <br />(/) D <br />0 <br />CL <br />121_ <br />cL <br />z <br />cL <br />Rivers Bend Pond -2024 <br />u_ <br />0 <br />0 <br />PROJECT LOCATION <br />0 <br />V") <br />z <br />z <br />0 <br />LU <br />2 <br />0 <br />0 <br />RECEIVING WATERS <br />ita itf-1 <br />3 3 <br />c<I) <br />.0 0 <br />PROJECT LOCATION: <br />5), <br />- <br />STABILIZEDCONSTRUCTION EXIT <br />5 <br />To_ <br />,1 <br />FA <br />NAME OF WATER BODY <br />b) <br />4 <br />< <br />1 <br />1 <br />;43 , <br />D 3, <br />., <br />V i <br />t <br />d <br />i <br />2 g2 <br />: 0 <br />tA <br />E ▪ q <br />8 <br />0 ri <br />WIPP _g- <br />2 <br />E <br />l_) <br />13 II <br />crl <br />c-ci 9 <br />g , <br />-, <br />. -6742il <br />•E ,,,- 2 <br />A <br />g3 <br />..N <br />n <br />F °o VIDillimilI <br />I <br />i <br />1!! <br />Et, L'4, FVE,1„ illh iiii.E,>1 <br />8 EiLil'I. LqqA E <br />-10 <br />E HIV" <br />ric ) <br />1 11 ill I . . I I 1 liri III big i . :I <br />El, <br />IN 17c <br />i7 :1; TM gli PH-,77,,In tri <br />Lciltm <br />DI, SIE l' B :16 n HiT1 <br />IMPLEMENTATION SCHEDULE AND PHASING: The Contractor is required to provide an updated schedule and site management plan <br />meeting the minimum requirements of Section 1717 of the Minnesota Standard Specifications for Construction. <br />1) Submit SWPPP Updates to Engineer. Submittal shall include any requested changes to the SWPPP, including but not limited to: <br />Trained Personnel, Locations for Stockpiles, Concrete Washout, Sanitation Facilities, Types and Locations of Erosion & <br />Sediment Control. Failure to submit updates shall be considered acceptance of the SWPPP as designed with no changes. <br />2) Install perimeter sediment control, inlet protection, and construction exit. <br />3) Complete Site Grading. <br />4) Add additional temporary BMPs as necessary during construction based on inspection reports. <br />5) Ensure final stabilization measures are complete. <br />6) Provide digital copy of all Field SWPPP Documentation including Inspection Reports and SWPPP Revisions to the Owner. <br />7) Submit Notice of Termination (NOT) to MPCA. NOTE: The NOT must be submitted to MPCA before Final Stabilization is <br />considered complete. <br />This project includes the following stormwater management BMPs: Biofiltration and wet sedimentation. <br />STORM WATER POLLUTION PREVENTION PLAN <br />oz <br />oTiE <br />mod <br />Hi <br />
The URL can be used to link to this page
Your browser does not support the video tag.