Laserfiche WebLink
<br />BID 5QID)lJLE "B" - WATERl'lAIN <br /> Estimate used <br />Item Quantity to Date unit price Extension <br />1. 6" pipe DIP 400 LF 641 LF $9.00 ILF $5,769.00 <br />2. 10" pipe DIP 1,300 LF 134B LF $14.00 ILF $lB ,B72. 00 <br />3. Hydrant 4EA 4EA $1,000.00 lEA $ 4 ,000 . 00 <br />4. 6" valve llEA IB EA $300.00 lEA $5,400.00 <br />5. 10" valve 2EA 2EA $550.00 lEA $1,100.00 <br />6. 10"x6"xl0" Tee 10 EA 17 EA $135.00 lEA $2,295.00 <br />7. 10"xl0"xl0" Tee lEA lEA $155.00 lEA $155.00 <br />B. 12"xl0" Reducer lEA lEA $100.00 lEA $100.00 <br />9. 10"x6" Reducer lEA lEA $70.00 lEA $70.00 <br />10. 10" Bend 3EA 3EA $100.00 lEA $300.00 <br />11. 6" plug lEA 15 EA $25.00 lEA $375.00 <br />12. 10" plug lEA lEA $60.00 lEA $60.00 <br />13. 1" service connection BEA 4EA $55.00 lEA $220.00 <br />14. 1" copper service pipe 2BO LF 150 LF $1l.00 ILF $1,650.00 <br />15. 2" service connection 4EA OEA $190.00 lEA $0.00 <br />16. 2" copper service pipe 140 LF OLF $10.00 ILF $0.00 <br />TOTAL BID SCHEOOLE "B" - WATERMAIN: $40,366.00 <br /> <br />SUl-lt>lARY OF BIDDIN::;: <br /> <br />TOtal Bid SChedule "A" - sanitary Water: <br />TOtal Bid schedule "B" - watermain: <br />I <br />TOTAL SCHEDULES" A" AND "B": <br />LESS 5% R....<'l'AINAGE: I <br /> <br />HE REC(W1END PARTIAL PAYMEtn' OF: <br />I . <br />please verify the a~unt of prevlous payments, if any, prior to making <br />payment. <br /> <br />$26,B12.00 <br />$40,366.00 <br /> <br />$67,17B.00 <br />$3,35B.90 <br /> <br />$63, B19 .10 <br /> <br />:2.7 <br /> <br />. -- -,. --. ---.. ....- ~-_-.., <br />