Laserfiche WebLink
PERSONNEL COMPLEMENT <br /> Public Works Superintendent 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Secretary(Formerly under Engineering) 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Mechanic 2.00 2.00 2.00 2.00 3.00 3.00 <br /> Street Supervisor - - 1.00 1.00 1.00 1.00 <br /> Streets Lead Worker 1.00 1.00 1.00 1.00 1.00 1.00 <br /> PW Maintenance Worker 5.00 5.00 5.00 5.00 8.00 8.00 <br /> Temporary-Streets 0.50 0.50 0.50 0.50 0.50 0.50 <br /> Street Maintenance Total 10.50 10.50 11.50 11.50 15.50 15.50 <br /> 6488/6489 Other Contracted Services <br /> Pavement Management Program Funding(Transfer to Pavement Managerr 260,742 300t000 - - - - <br /> Cracksealing/Rejuvenation/Pothole Patching 239,258 162)784 2001000 1,272,595 555)000 <br /> Curb Repair/Tree Removal - - 15,000 20)000 <br /> 500,000 462)784 215,000 1,272,595 575)000 <br /> 6540-Heavy Machinery <br /> F350 truck with plow(2021&2022 total cost) - 116)891 103;199 <br /> 2-Single Axis Plow Trucks - 5441318 <br /> Tandem Axle Truck with Plow less trade in$15,000 - 266,007 <br /> 721 G Front End Loader 226,000 <br /> - 116,891 103,199 2661007 770,318 <br /> 6550-Motor Vehicle <br /> 1-ton truck - 62,772 <br /> 2-3/4 ton trucks with plows(I new&I replacement) - - - 64,066 <br /> F550 44 Truck with 9'2"V-plow (New)with lift gate 109,000 <br /> - 62,772 640066 109,000 <br /> 6580-Other Equipment <br /> Sidewalk Machine 162,723 <br /> Snow Pusher Box for Front End Loader 23,500 <br /> Trailer for skidsteer 15,102 <br /> Toolcat 36,105 <br /> Skidsteer 57,372 <br /> Tire balancer(1/2 cost other 1/2 police) 9,453 <br /> Asphalt floater 14,405 <br /> ExMark Mower(less$2,500 trade in) 17,500 <br /> Pull behind PTO Mower(Less$1,000 trade in) 27,000 <br /> Trailer Mounted Boom Lift 58,000 <br /> Bobcat T66 Skidsteer 81,000 <br /> Scissor Lift JLG 2646 26)500 <br /> 10-Foot Slide in Removable Salt/Sander Spreader(Truck Mounted) 14,000 <br /> Hydraulic hose Crimping Machine 15,000 <br /> 271,302 23,858 23500 194,500 44,500 <br /> DESCRIPTION OF SERVICES: <br /> The Street Maintenance Department is responsible for maintaining city streets, <br /> sidewalks,traffic signs,boulevards,ROW mowing and the storm water collection <br /> system. <br /> J <br /> BUDGET HIGHLIGHTS <br /> a Market Rate Adjustments-From 3.03%-13.85% <br /> a COLA&Steps <br /> 0 Restrict public access at Public Works main entry and brace front desk- <br /> $12,000 <br /> 0 $45,000 additional funding for streetmaintenance improvements- <br /> $600,000 total <br /> a Replace 2015 Kubota mower(less$2,500 trade in)-$17,500 <br /> a Replace 2004 Landpride pull behind mower(less$1,000 trade in)-$27,000 <br /> 42 <br />