My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 10/24/2024
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2024
>
Agenda - Planning Commission - 10/24/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:37:31 PM
Creation date
11/15/2024 4:01:35 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
10/24/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. 3. <br />Regular Planning Commission <br />Meeting Date: 10/24/2024 <br />Primary Strategic Plan Initiative: Promote economic growth and development. <br />Information <br />Title: <br />PUBLIC HEARING: Consider a Conditional Use Permit for Motor Vehicle Repair for Blanery LLC at 6591 <br />141st Avenue NW <br />Purpose/Background: <br />Aliaksandr Blashchanitsa with Blanery LLC (the"Permittee") has submitted a Land Use Application for the <br />development of a 0.95-acre parcel at 6591 141st Avenue NW (the "Subject Property"). The project will consist of <br />a 9,600 square foot building for the proposed automotive repair business, 35 parking stalls, and driveways onto <br />both 141st Avenue NW and Basalt Street NW. To accommodate the automotive repair use, the Permittee is <br />requesting a Conditional Use Permit for Motor Vehicle Repair in the I-1 Light Industrial Zoning District. <br />It should be noted that this parcel is City -owned and the Permittee is proposing to purchase the parcel to <br />accommodate the proposed automotive repair business. <br />Notification: <br />Staff attempted to notify property owners within 350 feet of the Subject Property, as reflected in the Anoka <br />County Property Records, of the request and the Public Hearing to be held by the Planning Commission. A notice <br />of the Public Hearing was published in the Anoka County Union Herald, the City's official newspaper. A <br />proposed development sign was placed on the property at the intersection of 141st Avenue NW and Basalt Street. <br />Time Frame/Observations/Alternatives: <br />Subject Property <br />The Subject Property, 6951 141st Avenue NW, is located in the southeastern part of Ramsey, bounded by 141st <br />Avenue NW to the south, Basalt Street to the west, All Seasons Garage Door to the north, and an office building to <br />the east. The Subject Property is zoned I-1, Light Industrial District, and is guided for Business Park land uses in <br />the City's 2040 Comprehensive Plan. Surrounding properties are also zoned Light Industrial and guided for <br />Business Park land use. <br />Site Plan <br />The proposed Site Plan includes a 9,600 square foot building for automotive repair and two parking lots: one for <br />customers dropping off vehicles on the south side of the building accessing 141st Avenue NW and one fenced <br />and gated parking lot accessing Basalt Street on the north side of the building for vehicles awaiting repair. Both <br />driveways are spaced at least 150 feet from the intersection of 141st Avenue NW and Basalt Street. This spacing <br />will help facilitate safer traffic patterns into and out of the Subject Property. The proposed development has 23.2 <br />percent building coverage and 76.5 percent impervious surfacing coverage (which includes the building and all <br />paved surfaces). <br />Architecture and Building Elevations <br />The building will be 25 feet tall, as measured from the finished grade to the top of the parapet. A vertical wood <br />composite accent wall near the southwest building entrance will measure 27.5 feet in height. Aside from the <br />accent wall, the rest of the building will be primarily clad in EIFS panels, with aluminum storefront windows and <br />an architectural metal canopy surrounding the office and southwest entrance. There will be ten metal garage doors <br />into the building's repair shop wing - eight on the north side opening into the fenced parking lot and two on the <br />
The URL can be used to link to this page
Your browser does not support the video tag.