My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 10/24/2024
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2024
>
Agenda - Planning Commission - 10/24/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:37:31 PM
Creation date
11/15/2024 4:01:35 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
10/24/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/14/2024 12:57 PM <br />0 Replies <br />6 - Anoka County Highway Department <br />Created by: Chris Anderson <br />O n : 09/26/2024 11:59 AM <br />Anoka County Highway Department requested a meeting with city staff about this project. We <br />met (virtually) with them on 9.30.24 to discuss the project. They have concerns about the <br />number of direct access points on to a county highway and would prefer if an alternative design <br />could be found to reduce (or eliminate) the number of direct access points. Possible alternatives <br />could include concepts such as a frontage road, maybe a modified right turn lane on 181st, or a <br />cul-de-sac or two so that access could be shifted to a local road. They will be sending over <br />written comments. Once received, we will forward them to you. <br />0 Replies <br />7 - Access to Parcels to the South <br />Created by: Chris Anderson <br />O n : 09/26/2024 12 : 01 PM <br />It would be wise for the Greenwaldts (or Landform on their behalf) to contact the owners of the <br />two 20-acre parcels to the south. The 2 parcels are landlocked, and it would be beneficial to get <br />their input on potential access routes to their parcels. Should they petition for a 'cartway', the city <br />will be obligated to provide a 33 foot wide accecss corridor to their parcel(s) and it would likely <br />need to come from the north through high and dry land rather than impacting wetland. <br />0 Replies <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.