Laserfiche WebLink
Item No, Item UnIt Est. Quantity Unit Price Total Price <br /> 63 JOINT TRENCHED (FINISHED <br /> WATER) LF 3035 3650 160.91 $58782150 <br /> 84 2Q-INCH PVC WATER MAIN RJ ---------- <br /> TRENCHED (FINISHED WATER) LF 330 381 252.28 <br /> 65 WATER MAIN (HOO) (FINISHED WATER) LF LF 350 498.82 <br /> 65REV WATER MAIN (HOD) (FINISHED WATER) LF LF 380 230 380.18 $8744140 <br /> 66 24-|NCHDR18 FUSIBLE PVC -------- <br /> WATER MAIN (HOD) (RAW WATER) LF 2635 2640 631.62 $188747680 <br /> 67 24-(WOH PVC WATER MAIN RJ --------' <br /> TRENCHED (FINISHED WATER) LF 45 42 251.20 <br /> 08 24'INCH PVC WATER MAIN RJ <br /> TRENCHED (RAVVWATER) LF 1320 1425 276.88 <br /> 68 24'|NDH PVC WATER MAIN STAB <br /> JOINT TRENCHED (RAW WATER) LF 4310 4193 204.45 $85725885 <br /> 70 WATER METER VAULT LG 1 1 321,885.00 <br /> 71 DUCTILE IRON FITTINGS LB 24960 24874 12.78 $317889.72 <br /> ADDITIONAL BID COST <br /> 72 PREVAILING WAGES ARE ADDED <br /> ASAREQUIREMENT LS 1 0.01 <br /> 73 <br /> ANOKA COUNTY ROW PERMIT EACH 1 1 150.00 <br /> CHANGE ORDER 1 (AFPO) LG ------ 1- 1300116.38 <br /> CHANGE ORDER 2(AFPO) LS 1 141.808.88 $141608.93 <br /> CHANGE ORDER 3 L8 1 124'785.45 $124760.45 <br /> CHAW(3EORDER 4 L8 --------- 08.898.37 <br /> Total Contract A-mount <br /> ^ <br /> paoe,s oil 4 <br />