be collected as future phases develop frontage along 146 th Avenue or Traprock Street. <br /> Alternative Bid <br /> Twenty-three(23) of the pedestrian ramps proposed to be replaced are connections to the trail system within The <br /> Draw Park, generally along Ramsey Parkway between Center Street and Ramsey Boulevard. The trail itself still <br /> has some useful life remaining,but is showing significant exposed aggregate. Staff proposes to include an <br /> alternative bid to mill and overlay the bituminous trails within The Draw Park. There are approximately 1,625 <br /> linear feet of trails, staff estimates construction costs of$130,000 to perform this work. Overlaying the trails are <br /> not included within the CIP, and does not qualify to use Pavement Management Funds. Potential funding sources <br /> will be explored during project design, and would be presented at time of plan approval. <br /> Additional Permitting <br /> Because portions of the project go up to the Anoka County right-of-way, and will require temporary signage <br /> within said right-of-way, an Anoka County Highway Department Right-of-Way Permit will be required.No other <br /> permits are anticipated. <br /> Project Timelines <br /> City Staff is proposing to prepare plans and specifications for this project in-house, as part of their normal duties. <br /> The following are the proposed general project timelines: <br /> November 26, 2024 City Council Authorization to prepare plans and specifications <br /> Dec 2024/Feb 2025 Staff prepares plans and specifications <br /> Feb/March,2025 City Council approve plans, authorize bidding <br /> March/April, 2025 Bid opening, City Council award contracts <br /> Spring 2025 Begin Construction <br /> Summer 2025 Finish Construction <br /> Staff proposes to bid projects separately,but to bid and award projects as close together as practical,which <br /> generally allows for a better bidding environment for the City. <br /> Notification: <br /> If City Council orders plans and specifications for this improvement project, staff will send notification letters to <br /> residents impacted by these improvements. <br /> Time Frame/Observations/Alternatives: <br /> Observations: <br /> Estimates are CIP level and will be updated during the design process. <br /> Alternatives: <br /> Motion to adopt Resolution#24-342 ordering plans and specifications for 2025 Neighborhood Pavement Overlay <br /> Improvements, Improvement Project#25-07. <br /> Funding Source: <br /> Funding for this improvement is proposed to come from Pavement Management Funds and Storm Water Utility <br /> Funds. The alternative bid trail improvements are anticipated to be funded through budgeted 2025 Trail <br /> Maintenance Funds,Park Trust Funds, or Public Improvement Revolving Funds; final funding options are <br /> proposed to be presented at the time of final plan approval. <br /> Pavement Management Funds $1 10471 1 1 1 <br /> Storm Sewer Utility Funds $691190 <br /> CIP Total Project Costs $19130,801 <br /> Alt Bid Trail(Funds TBD) $130,000 <br /> Total Project w/Alt Bid $11 260,801 <br />