My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/26/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 11/26/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:39:07 AM
Creation date
11/26/2024 2:12:43 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/26/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT <br /> 11-7-24 <br /> The report shall include an opinion of probable cost and how the project would be <br /> funded. The Board shall consider the feasibility study and decide whether to <br /> proceed with the proposed project. <br /> (c) Plan Amendments. Proposed CIP Projects are amended into and made part of the <br /> Watershed Management Plan. The process the Commission must undertake to <br /> amend a CIP Project into the Watershed Management Plan depends on whether it <br /> constitutes a minor plan amendment or a major plan amendment as described <br /> below. <br /> (1) Minor Plan Amendment. The addition of a proposed CIP Project to the <br /> Watershed Management Plan typically constitutes a minor plan amendment <br /> that can be accomplished following the process set out in the Watershed <br /> Management Plan and Minn. R.,part 8410.0140, subpart 2. A public hearing <br /> is not required for a minor plan amendment. <br /> (2) Major Plan Amendment. If a proposed amendment does not qualify as a <br /> minor amendment, the Commission must undertake the major plan <br /> amendment process to add the CIP project to the Watershed Management <br /> Plan. The major plan amendment process is set out in the amendment section <br /> of the Watershed Management Plan, Minn. Stat. § 103 B.231, subd. 11, and <br /> Minn. R., part 8410.0140. The public hearing required under Minn. Stat. § <br /> 103B.23I, subds. 11 & 7(c) for a major plan amendment may be held in <br /> conjunction with the public hearing required to request the County to levy <br /> funds for the project under Minn. Stat. § 103B.251, subds. 3 &4, provided the <br /> requirements of both procedures can be satisfied at the single hearing. <br /> (d) Public Hearin. If the Board proposes to pay any portion of a CIP Project with <br /> funds to be raised through a County levy under Minn. Stat. § 103B.251, the Board <br /> must call and conduct a public hearing as provided in the statute and this <br /> paragraph. A public hearing is not required if the CIP Project is funded entirely <br /> from funds on hand, grants, or a combination thereof, and does not require the <br /> Board to certify any project costs to the County to be levied under Minn. Stat. § <br /> 103B.251. When a public hearing is required, it shall be conducted in <br /> accordance with the following. <br /> (1) Calling. The Board must act by motion or resolution to call a public hearing <br /> on the proposed CIP Project. The Board shall set the date, time, and place <br /> for the public hearing. <br /> (2) Notice. The Board shall provide notice of the public hearing in accordance <br /> with Minn. Stat. § 103B.251, subd. 3. <br /> (3) Conducting. The Board shall conduct the public hearing at the scheduled <br /> date, time, and place to hear from the public and to consider the proposed <br /> CIP Project. Prior to taking public comment, the Commission Engineer <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.