<br />City Engineer Jankowski replied it is expected that the water main will be done sometime in <br />September with the deep sewer done sometime in October. <br /> <br />Mr. Roberts questioned if there will be contractors using Welcomes Road while it is being <br />constructed. <br /> <br />Public Works Director Olson replied it is likely that the contractors will find a different route due <br />to the construction. <br /> <br />Mr. Roberts inquired if the bid for the project included the idea of going around or going through <br />Welcomes Road. He explained his major concern is what the construction traffic will do to a <br />freshly laid road. <br /> <br />Public Works Director Olson indicated he does not expect the construction traffic for the sewer <br />and watermain project will utilize Welcomes Road very much. There will likely be more traffic <br />on Welcomes Road when it is completed, but it will be built to standards. <br /> <br />Chairperson Elvig inquired about the possibility of posting a load rating on Welcomes Road in <br />order to allow the bituminous to cure properly before the large equipment is driven on the road. <br /> <br />Public Works Director Olson explained Welcomes Road will be closed when the construction <br />activity begins at the end of July; the only traffic will be residential. The sewer and watermain <br />project should be completely finished by the end of August or early September before Welcomes <br />Road is opened. Staff can be certain that Welcomes Road is not opened until the sewer and <br />watermain construction is finished. <br /> <br />Colleen Zimmerman, 7550 163Td Lane NW, stated her understanding was that a count was done <br />last year. The residents would like to see the difference in the traffic count from one year ago <br />and now; they really feel there is more traffic now. <br /> <br />Chairperson Elvig noted the construction traffic should not be an issue any longer as of the <br />middle of July. As far as the building of Sweetbay Ridge and Brookfield, that traffic will come <br />off the main collectors. <br /> <br />Civil Engineer II Linton indicated restoration work has been started along Variolite Street. <br /> <br />Motion by Chairperson Elvig, seconded by Councilmember Cook, to direct staff to delay the <br />opening of Welcomes Road until the watermain construction on the west side of Welcome's <br />Road is complete. <br /> <br />Motion carried. Voting Yes: Chairperson Elvig, Councilmembers Cook and Olson. Voting No: <br />None. <br /> <br />Public Works Committee I June 20, 2006 <br />Page 8 of 15 <br />