Laserfiche WebLink
<br />March 23, 1988 <br /> <br />Page 8 <br /> <br />Reference: Anoka Sp::>rts Center, Ramsey, MN <br /> <br />j). The service bay will be provided with a 600 cfrn overhead exhaust <br />system for gasoline p:>Wered engines including ductwork and an <br />exhaust blower vented through the roof excluding rubber hoses <br />for an additional. . . . . . . . . . . . . . . . . .. . . . . . $ 1,200.00 <br /> <br />k). <br /> <br />The service bay will be provided with a 400 cfrn make-up air <br />and ventilation system for an additional. . . . . . . . . . <br /> <br />. . <br /> <br />.$ 7,720.00 <br /> <br />1). Five 12' strips of track lighting with thirty 150 watt fixtures <br />will be provided for an additional. . . . . . . . . . . . . . . .$ 1,620.00 . <br /> <br />14. Alternate for Tax Increment Fi.nancing,,- <br /> <br />The City of Ramsey Engineer and Plannins Administrator have stated that <br />construction costs the city will include and support under their tax incre- <br />ment financing program include clearing and grubbing, grading and filling, <br />Class 5 gravel fill, soil correction, storm sewer, curb and gutter, exterior <br />lighting, landscaping (sod, trees and plantings) and la'Wn irrigation. The <br />City of ~ey will provide all design drawings for TIF financed items. <br />Estimated construction costs for each item are; <br /> <br />a). ClearL~g a~d grubbing. . . . . . . . . .$ 6,970.00 <br />b). Grading and fill. . . . . . . . . . . . $ 13,950.00 <br />c). Class 5 gravel fill. . . . . .$ 6,030.00 <br />d). Storm sewer. . . . . . . . . . .$ 2,335.00 <br />e). CUrb and gutter. . . . . . . .$ 5,480.00 <br />f). Exterior lighting. . . . . . . .$ 7,790.00 <br />g). Landscaping. . . . . . . . . . . . .$ 10,000.00 <br />h). lawn irrigation. . . . . . . . .$ 5,500.00 <br />i). General conditions. . . . . . . . . $ 8,165.00 <br />j). Plumbing. . . . . . . . . .'. . . . . . $ 1,280.00 <br /> <br />TJrl-.r, GEDIT. <br /> <br />................. <br /> <br />..... <br /> <br />. . . . . . $57,500.00 <br /> <br />15. ScheCu1 e. <br /> <br />&~ticipating authorization to working drawings L~ conj~~ction with the City <br />Engi.~?erbegi11J1iJ1g site and grading pla.'1s by April 15, 1988, we could pro- <br />vide a firm price pro?,sal by 1-'.ay 15, 1988 and begi:1 construction as early <br />as June 1, 1988. A continuous construction sche6u1e of 16 weeks ~i11 be <br />req~ired to cOill?lete the building for occupancy by late September, 1988. <br /> <br />16. Co~tract A~~t. <br /> <br />Stiqlich Construction, Inc. will construct the faci1itv of this ore lLuina ='" <br />- ... .. .. <br />oroDOsal exclucL~a all alternates with a orocress pavme'1t contract for a. <br />contract a~unt of $406,500.00 to $426,500.00. - <br /> <br />8*3 <br />